My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 10:57:44 AM
Creation date
3/11/2024 8:29:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0505356
PE
2361 - UST FACILITY
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
18662 N STATE ROUTE 88 LOCKEFORD 95237
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> 2-comprt.=Two compartment. PS=Piping Sump. Western FG=Western Fiberglass. BP=Bottom <br /> Penetrations. <br /> Note: Tank #2 Plus 89, and Tank #3 Super 91 is a 10K, two compartment Tank. Tank #2 is <br /> designated for 6K Plus 89 Octane Gasoline. Tank #3 is designated for 4K Super 91 Octane <br /> Gasoline. Tank #2, and Tank 3, have a common Tank Secondary Containment. <br /> Note: UDC's 1&2 and 7&8 will not maintain hydrostatic test level, and show a loss of >.030 in the 30 <br /> test period. We found material degradation around the Electrical Penetrations in both UDC's. <br /> Recommend a repair contractor be consulted. Recommend a Bravo Repair Kit be used to reseal all <br /> Piping and Electrical Penetrations in both these UDC's. Retest after repairs are complete. <br /> Note: Initial pressure loss on the Diesel Secondary Pipe with bubbles showing on the test boot. We <br /> found material degradation on the test boot and a small crack on the end of the tapered portion of <br /> the Secondary Pipe. We replaced the test boot and were able to place the test boot past the <br /> tapered portion of the Secondary Pipe to gain a proper seal. No further pressure loss or bubbles <br /> were detected for the 1 hour test period. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.