Laserfiche WebLink
Part 3.FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> 1:11.DESIGN(describe): <br /> E-12.OPERATION(describe): Updated TPR and RCSI(dated 2014)to reflect current operations and acceptance of cannery rinsate in RCSI. <br /> 1:13. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): <br /> E14.OTHER(describe): Updated TPR and RCSI(dated 2014)to reflect current site conditions. <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES: <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS: (Combined for Forward Landfill,RRF,and Compost Operation) <br /> 1) DISPOSAL/TRANSFER(unit): In no case will total inflow for Landfill and Resource Recovery Facility(incl.Compost Operation)exceed 8,668 TPD <br /> (or 46,080 tons/week). <br /> 2) OTHER(unit) <br /> b. DAILY DESIGN TONNAGE(TPD): In no case will total inflow for Landfill and Resource Recovery Facility(incl.Compost Operation)exceed 8,668 TPD <br /> (or 46,080 tons/week). <br /> c. FACILITY SIZE(acres): 33.23 acres(Trans/Proc Facil-10.64 ac;Compost-22.59 ac) <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd):620 vpd of combined traffic for Forward Landfill and RRF/Compost Facility <br /> e. DAYS AND HOURS OF OPERATION: 6:00 a.m.to 6:00 p.m.,Monday through Saturday.The facility is closed on Sundays and two major holidays. <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> a. SITE STORAGE CAPACITY: 640-1,100 TPD(Compost Oper);500 TPD(Transfer/Proc Oper)(Not to exceed total combined tonnage listed above) <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a. AVERAGE DAILY TONNAGE(TPD): <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds): <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds): <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds): <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds): <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions): <br /> g. LAST PHYSICAL SITE SURVEY(Date): <br /> h. ESTIMATED CLOSURE DATE(month and year): <br /> I. DISPOSAL FOOTPRINT(acres): <br /> j. SITE CAPACITY PLANNED(cu yds): <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste): <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v): <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace): <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> ❑A. MUNICIPAL OR UTILITY SERVICE: <br /> MB.INDIVIDUAL(wells): <br /> ❑C.SURFACE SUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC. <br /> 2.TYPE OF WATER RIGHTS: <br /> RIPARIAN ®APPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE <br /> Page 2 <br />