Laserfiche WebLink
FORWARD LANDFILL <br />RESOURCE & RECOVERY <br />2013-2014 WINTERIZATION PLAN <br />November 1, 2013 <br />1. Grinding Pad & Sorting Pad <br />The pad has been graded such that the water flows to the northwest corner. It is then collected in <br />a ditch and delivered to the sediment pond located at the west of the Resource & Recovery (R & <br />R) area. <br />2. Compost Pad <br />Composting activities are being performed on an approximately 10 -acre area. The composting <br />activities are limited to green waste materials. <br />3. Transfer Station <br />Operation of the R & R transfer station continues. The transfer of recyclables is done within the <br />twelve thousand square feet (12,000 sq) building located on the eastern end and middle (North- <br />South) of the R & R area. Rainwater from the roof of the building is directed from the down <br />spouts to the existing drain ditches and then to the sedimentation pond. <br />4. Sediment Pond <br />All non -contact water being directed to the R & R's sedimentation pond is sampled and analyzed <br />in accordance with Forward's Storm Water Pollution Prevention Plan and Storm Water <br />Monitoring Plan. If the pond is at capacity and the stormwater samples comply with the <br />discharge requirements, non -contact water is discharged to the South Fork of Little Johns Creek. <br />A log is kept on site recording the volume of non -contact water discharged to the creek from the <br />pond. <br />5. Roads <br />All roads have been graded to provide a safe and stable surface for travel and to direct runoff to <br />the existing ditches that route to the sediment pond. Roads will be cleared of mud as needed to <br />prevent tracking onto Austin Road. Austin Road will be cleared, as needed, by sweeper truck or <br />water truck. <br />