Laserfiche WebLink
Mr. Robert McClellon <br />FORWARD RRF (39 -AA -0020) <br />Solid Waste Facility Permit Application - Five Year Permit Review <br />December 23, 2013 <br />Page 2 of 2 <br />conditions at the Forward RRF. SWT will be working toward having both the updated TPR <br />and RCSI to the LEA by February 3, 2014. As the submittal date approaches, we will <br />inform you of any changes. In addition, the submittal will also include a copy of text <br />changes shown in "Track Changes" format (i.e., red strikethrough and underline) for ease <br />in your review in identifying revisions to these permit documents. <br />There have been no public hearings and/or other meetings held that are applicable to <br />this Five -Year Permit Review. <br />In accordance with 27 CCR, Section 21570, the owner/operator of the Forward RRF, <br />(Forward, Inc.) certifies that all information contained in this SWFP Five -Year Permit <br />Review Application form for the site is accurate and true to the best of their knowledge <br />and belief. Information contained in this application package was generated by Forward <br />Inc., as well as duly authorized parties. <br />If you should have any questions regarding this submittal, please advise. <br />Respectfully submitted, <br />John R. Boucher <br />Principal Planner <br />Attachments <br />c: County of San Joaquin, Community Development Department Director (1 copy of SWFP) <br />Kevin Basso, General Manager, Forward Inc. (1 copy) <br />Don Litchfield, Forward Landfill, Inc. (1 copy) <br />Erin Fanning, Forward Landfill, Inc. (1 copy) <br />Lori Olin, SWT Engineering <br />SWT Engineering <br />Z:\PROJECTS\Allied Waste\Forward\Resource Recovery Facility\5 Yr Permit Rvw\SWFP App 2013\L_SJCLEA_5 Yr PR_120213.doc <br />