Laserfiche WebLink
Part 3. FACILITY INFORMATION <br />A. PROPOSED CHANGE (Check applicable box(es)): <br />❑1. DESIGN (describe): <br />O2. OPERATION (describe): Updated TPR and RCSI (dated 2014) to reflect acceptance of/procedures for cannery residual materials and cannery rinsate, <br />M3. OWNER, OPERATOR, ADDRESS, AND/OR FACILITY NAME CHANGE (describe): <br />M/ 4. (describe): Updated TPR and RCSI (dated 2014) to reflect current site conditions. <br />B. FACILITY INFORMATION: <br />1. INFORMATION APPLICABLE TO ALL FACILITIES: <br />a. PEAK DAILY TONNAGE OR CUBIC YARDS: (Combined for Forward RRF and Compost Operation) <br />1) DISPOSAL/TRANSFER (unit): 4,180 tons per day (TPD) - (3,080 TPD for the RRF and 1,100 TPD for the Compost Operation) <br />In no case will total inflow for Landfill and Resource Recovery Facility (incl. Compost Operation) exceed 8,668 TPD (or 46,080 tons/Week) <br />2) OTHER (unit) <br />b. DAILY DESIGN TONNAGE (TPD): 4,180 tons (combined for Forward Landfill and RRF including compost operations) <br />c. FACILITY SIZE (acres): 33.23 acres (Trans/Proc Facil -10.64 ac; Compost - 22.59 ac) <br />d. PEAK TRAFFIC VOLUME PER DAY (vpd): 150 vpd (as part of 620 vpd of combined traffic for Forward Landfill and RRF/Compost Fac.) <br />e. DAYS AND HOURS OF OPERATION: 6:00 a.m. to 6:00 p.m., Monday through Saturday. The facility is closed on Sundays and four major holidays. <br />2. ADDITIONAL INFO. REQUIRED FOR COMPOSTING FACILITIES ONLY: <br />a. SITE STORAGE CAPACITY: 640 -1,100 TPD (Compost Oper); 500 TPD (Transfer/Prot Oper) (Not to excel total combined tonnage listed above) <br />3. ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br />a. AVERAGE DAILY TONNAGE (TPD): <br />b. SITE CAPACITY CURRENTLY PERMITTED (Airspace) (cu yds): <br />c. SITE CAPACITY PROPOSED (Airspace) (cu yds): <br />d. SITE CAPACITY USED TO DATE (Airspace) (cu yds): <br />e. SITE CAPACITY REMAINING (Airspace) (cu yds): <br />f. DATE OF CAPACITY INFORMATION (Date) (See instructions): <br />g. LAST PHYSICAL SITE SURVEY (Date): <br />h. ESTIMATED CLOSURE DATE (month and year): <br />I. DISPOSAL FOOTPRINT (acres): <br />j. SITE CAPACITY PLANNED (cu yds): <br />k. 1. (1) IN-PLACE WASTE DENSITY (Ibs of waste per cu yd of waste): <br />AND <br />(ii) WASTE -TO -COVER RATIO (Estimated) (v:v): <br />OR <br />2. AIRSPACE UTILIZATION FACTOR (tons of waste per cu yd of landfill airspace): <br />Part 4. SOURCE OF WATER SUPPLY (Check applicable boxes) <br />❑A. MUNICIPAL OR UTILITY SERVICE: <br />®B. INDIVIDUAL (wells): <br />❑C. SURFACE SUPPLY: <br />1. NAME OF STREAM, LAKE, ETC. <br />2. TYPE OF WATER RIGHTS: <br />RIPARIAN ®APPROPRIATION <br />3. STATE PERMIT OR LICENSE NUMBER, IF APPLICABLE <br />Page 2 <br />