Laserfiche WebLink
rages ut i o <br />INTRODUCTION <br />The Order impact Nfinimization Plan (OR") has been developed to provide guidance to <br />on-site personnel in the handling, storage, and removal of compost able materials, in <br />accordance with 14 CCR 17863.4. This ORMP will be revised as necessary to reflect <br />enforcement agency within 30 days of the changes. In addition, this OEMP will be <br />reviewed annually to determine if any revisions are necessary. <br />�Vhe chix'jir.6 azzcf !'vimdiAL L. mv_rce svq.zraef yeeerxals is crioxtuctel as j'&r'+f <br />the diversion efforts at the (landfill name). In short; green materials are received from <br />the public and commercial sectors and stored in designated areas until processed (i.e., <br />chipped and ground) by a contractor. At no time is more than 12,500 cubic yards of <br />feedstock, compost, or chipped and ground material on-site at any time. The <br />feedstock is processed within 7 days of receipt and the finished products removed <br />