Laserfiche WebLink
From: Saetern, Kristina Gaen [EHD] <ksaetern@sigov.org> <br /> Sent:Tuesday, August 22,2023 11:41 AM <br /> To:Tara Hickman<thickman@ups.com> <br /> Subject: [EXTERNAL] RE: PR0231522 - 1532 N Broadway <br /> Hi Tara, <br /> This Monitoring System Certification that was conducted on 5/25/2023 was received and will not be accepted.This is <br /> because the Monitoring System Certification listed the Leak Detector as VMI 99LD2000. While on site, a Red Jacket FXIV <br /> was observed on site.This was confirmed by the technician on site. I had attached photos that was obtained during the <br /> inspection. Please have the technician/company verified and revised the Monitoring System Certification with the <br /> correct leak detector. <br /> Additionally,your facility has an open service request SR0082977 that needs additional inspections and needs updated <br /> documents.An amended inspection report that was emailed to Imtrigos@ups.com, sam.colgan@arcadis.com and Rudy <br /> Vasquez rvasquez@americaintegrated.com on 1/5/2023. 1 had attached the amended service request for your review. <br /> The service request was initially approved for the FE Petro. Please submit an updated scope of work, parts list, cut <br /> sheet for the Red Jacket leak detector, and certification for the installer who did the work. <br /> You can find the required inspection appointments in section#3. Please clarify if these inspections were conducted. See <br /> the list below: <br /> 3. Provide written notification to ust@sigov.org to arrange the following appointments (a 48- hour notice is required for <br /> inspection appointments). <br /> a) Leak detector test: Leak detector must be tested ton confirm that the device can detect a leak of 3 gallons per <br /> hour at 10 psi. <br /> b) Overfill prevention verification: Measurement of drop tubes to verify 95%tank volume shut off. (Conducted on <br /> 02/06/2023 &02/09/2023) Send the test results <br /> c) Primary piping test: Soap test of new piping and penetrations, and one-hour pneumatic pressure test, in <br /> accordance with manufacturer installation instructions. <br /> d) Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to backfilling. (Conducted on <br /> 02/02/2023) <br /> e) Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic test or equivalent), after <br /> concrete is set. Proper drainage must also be verified. (Conducted on 02/06/2023 &02/09/2023) Send the test <br /> results. <br /> f) Since concrete will be broken near the tank, a secondary containment test must be performed on the tank once <br /> concrete is poured in accordance with the manufacturer's guidelines. <br /> Please let me know if you have any questions. <br /> Best regards, <br /> Kristina Saetern <br /> Environmental Health Specialist <br /> San Joaquin County Environmental Health Department <br /> 1868 E. Hazelton Avenue <br /> Stockton, CA 95205 <br /> P: (209) 616—3045 1 E: ksaetern@sigov.org <br /> ** I am out of the office every other Friday as follows:July 4, 14, 28 1 August 14, 28 September 8, 22 <br /> 6 <br />