Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for AM PM HAMMER/15 FOOD #83113 as of March 18, 2024. <br /> Open violations from May 25, 2023 inspection <br /> Violation#110-Failure to submit the"Underground Storage Tank Statement of Understanding and <br /> Compliance Form". <br /> OBSERVATION: The Underground Storage Tank Statement of Understanding and Compliance Form was not found <br /> in CERS. <br /> REGULATION GUIDANCE: This form must be uploaded to the California Environmental Reporting System (CERS). <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS)at <br /> http://cers.calepa.ca.gov and upload the Underground Storage Tank Statement of Understanding and Compliance <br /> Form for this facility. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION:An inspection was last done on 5/25/2022 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 6/24/2022. This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 6 <br />