My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 11:46:25 AM
Creation date
3/21/2024 3:50:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0508352
PE
2361 - UST FACILITY
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3355 E HAMMER LN STOCKTON 95212
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. Ifs-TANK GAUGING TESTING j <br /> Z Check this box if tank gauging is used only for inventory control. <br /> Q Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ ❑ <br /> termination; and 2) tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ ❑ <br /> to ensure that floats move freely, functional!y tested. and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fara <br /> ❑ Lj <br /> ❑ ❑ <br /> ❑ ❑ <br /> Q Q <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No'or ''Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.