My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022-2023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
916
>
4400 - Solid Waste Program
>
PR0526865
>
COMPLIANCE INFO_2022-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 8:23:31 AM
Creation date
3/26/2024 12:19:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4800 – General/Other Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022-2023
RECORD_ID
PR0526865
PE
4443
FACILITY_ID
FA0018195
FACILITY_NAME
CENTRAL VALLEY COMPOST
STREET_NUMBER
916
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19126022
CURRENT_STATUS
01
SITE_LOCATION
916 W FREWERT RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Compostable Materials Handling Operation and Facility Inspection <br /> Report ( 93 ) <br /> Central Valley Compost ( 39-AA-0051 ) <br /> NOTES : <br /> 1 . Operator provides records by email . <br /> 2 . The odor, track out and fly population were light. <br /> 3 . A litter fence is in the process of being installed near the eastern fence . <br /> 4 . The following temperatures were measured during the inspection : <br /> - Raw green waste was 111 ° F . <br /> - Ground green waste was 112° F . <br /> - Windrows ranged from 142° F to 166° F. <br /> . Finished product ranged from 113° F to 154° F <br /> - Biosoil was 98 ° F <br /> - Biosoil with dirt was 98° F <br /> . Compost with gypsum was 102 ° F <br /> - Overs were 138° F <br /> 5 . The weather during the inspection was 66° F with a wind speed of 6 mph . <br /> 6 . Operator added additional fly stations for fly control . <br /> 7 . Records for SB1383 measurements were provided to the EHD for the 2nd quarter. <br /> 8 . A facility tour was conducted on July 21 , 2022 with Christine Karl (CalRecycle) , Marcus <br /> Santillano (CalRecycle) , Abel Aceves (Central Valley Compost) , Jonathan Rocha (Central <br /> Valley Compost) Natalia Subbotnikova ( EHD) , Tom Hoang (EHD), and Sandip Singh (EHD) . <br /> SB1383 measurement and record keeping regulations were discussed . CalRecycle staff were <br /> available to answer questions . <br /> CalRecycle Solid Waste Information System (SWIS) Page 2 of 3 <br /> !� _ .. . .._1_ .A . n . . ... . ._L n nnnn 4 . 4 A MAA <br />
The URL can be used to link to this page
Your browser does not support the video tag.