Laserfiche WebLink
Third Quarter 2023 <br />Table 2. Structure Vent Riser Monitoring Results <br /> Harney Lane Landfill, Lodi, California <br />Point Name Record Date CH4 <br />(% by vol) <br />CO2 <br />(% by vol) <br />O2 <br />(% by vol) <br />Bal Gas <br />(% by vol)Comments <br />Structure 1 8/30/2023 13:09 0.00 0.00 20.40 79.60 <br />Structure 2 8/30/2023 13:11 0.00 0.00 20.70 79.30 <br />Structure 3 8/30/2023 13:13 0.00 0.00 20.80 79.20 <br />Structure 4 8/30/2023 13:14 0.00 0.00 20.90 79.10 <br />Structure 5 8/30/2023 13:16 0.00 0.00 20.90 79.10 <br />Structure 6 8/30/2023 13:18 0.00 0.00 20.90 79.10 <br />Structure 7 8/30/2023 13:19 0.00 0.00 20.90 79.10 <br />Structure 8 8/30/2023 13:21 0.00 0.00 21.00 79.00 <br />Structure 9 8/30/2023 13:24 0.00 0.00 20.70 79.30 <br />Structure 10 8/30/2023 13:25 0.00 0.00 20.80 79.20 <br />Structure 11 8/30/2023 13:26 0.00 0.00 20.80 79.20 <br />Structure 12 8/30/2023 13:28 0.00 0.00 20.80 79.20 <br />Structure 13 8/30/2023 13:29 0.00 0.00 20.90 79.10