Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST (continued) <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum M Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID UDC 5&6 UDC 7-Sat UDC 7&8 UDC 8&9-Sat <br /> Sump Manufacturer Total Cont Total Cont Total Cont Total Cont <br /> Sump Depth (inches) 26" 27" 28" 27" <br /> Sump Bottom to Top of 9" 8" 9" 8" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:17 11:22 11:27 11:32 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 11:47 11:52 11:57 12:02 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID UDC 9&10 UDC 10-Sat UDC 11-Sat UDC 11&12 <br /> Sump Manufacturer Total Cont Total Cont Total Cont Total Cont <br /> Sump Depth (inches) 28" 27" 27" 28" <br /> Sump Bottom to Top of 9" 8" 8" 9" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:37 11:42 12:17 12:22 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 12:07 12:12 12:47 12:52 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria > .002 > .002 > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 6 of 9 <br />