Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1.FACILITY INFORMATION <br /> Facility Name:7-Eleven 38153 Date of Testing:4/11/2024 <br /> Facility Address: 121 S.Center Street,Stockton,CA 95202 <br /> Facility Contact:manager Phone:209-361-8332 <br /> Date Local Agency Was Notified of Testing:4/4/2024 <br /> Name of Local Agency Inspector(if present during testing):UNKNOWN <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name:TANKNOLOGY INC. <br /> Technician Conducting Test:Jesus Saldivar <br /> Credentials l: r— CSLB Contractor 1W ICC Service Tech. r— SWRCB Tank Tester r— Other(Specify) <br /> License Number(s): <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used By: 1W Hydrostatic F Vacuum F Other <br /> Test Equipment Used:LAKE TEST Equipment Resolution:0.0625 in. <br /> Spill Box#Tank Tl: Spill Box#Tank T2: Spill Box#Tank T3:DIESEL <br /> Identify Spill Bucket(By Tank REGULAR UNLEADED PREMIUM UNLEADED Diesel-Fill 1-Direct- Spill Box# <br /> Number, Stored Product, etc) REG UNLEAD-Fill 1- PREMIUM-Fill 1-Direct- Grade level <br /> Direct-Grade level Grade level <br /> Bucket Installation Type: rDirect Bury C Direct Bury r Direct Bury C Direct Bury <br /> C: Contained in Sump C Contained in Sump C: Contained in Sump C Contained in Sump <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 16.00 16.00 16.00 <br /> Wait time between applying <br /> 5 min 5 min 5 min min <br /> vacuum/water and start of test <br /> Test Start Time(TI): 10:00:00 10:00:00 10:00:00 <br /> Initial Reading(RI): 15.00 in.1420 15.00 in.H2O 15.00 in.H2O <br /> Test End Time(TF): 11:00:00 11:00:00 11:00:00 <br /> Final Reading(RF): 15.00 in.1420 15.00 in.H2O 15.00 in.1420 <br /> Test Duration(TF—TI): 1 hr 1 hr 1 hr <br /> Change in Reading(RF—RI): 0.00 in.H2O 0.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +/- <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Al Date: 4/11/2024 <br /> 'State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements may be more stringent. <br /> WO:2366018 <br />