My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14000
>
2300 - Underground Storage Tank Program
>
PR0231631
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:38 AM
Creation date
4/2/2024 11:42:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231631
PE
2361
FACILITY_ID
FA0000091
FACILITY_NAME
H&S Energy Products,#3038
STREET_NUMBER
14000
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
14000 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, INC. ,M0,0ge�c/ 7(o <br /> Overfill Prevention Inspection- OPW 61 and 71 Series Devices <br /> Date: <br /> Owner: <br /> Facility: <br /> OPW Overfill Model Number. <br /> Part 1 -Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per: A Gallons o1 03� <br /> Max shut off requirement for flapper is 95% s 95% <br /> Multiply Max tank volume by 95% C Gallons 'J <br /> Use tank chart or ATG to determine height of D Inches L713 <br /> calculated volume v <br /> Measure top of fill riser threads,or face seal E Inches <br /> adapter <br /> Tank diameter(From Tank Chart) F Inches 7J`� <br /> Upper Tube in Tank(G)F-D=G G Inches 97,37,5 <br /> Subtract 2"from upper tube in tank G-2"=K K Inches <br /> Calculated minimum upper tube length(1) I Inches <br /> +E=I <br /> Actual measured upper tube length(Without <br /> fill adapter) J laches <br /> Part 2*Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95% <br /> requirement? <br /> Is the actual measured upper tube length 6.5 inches or <br /> more than the fill riser?(J must be 6.5"or more than E) <br /> Does the overfill prevention device function as required? <br /> (Inspect the device for damage,contamination,freedom of <br /> movement,weakening due to wear and corrosion <br /> Device Overfill Certification PASS/FAH. <br /> Drop Tube Testing PASS/FAIL <br /> Technician certifies that the device is operationally compliant. <br /> Signature of Technician: Date: <br /> Technician's Name: <br />
The URL can be used to link to this page
Your browser does not support the video tag.