Laserfiche WebLink
_ ' . _ 1 ' \` � \s www. opwglobal. com <br /> Materials Important OPW 7150 Overfill <br /> Valve body : Cast aluminum In order to prevent product Prevention Valves <br /> spillage from the Underground <br /> Float : Nitrile rubber, closed cell foam Storage Tank (UST), properly <br /> maintained delivery equipment The CARB-Certified OPW 71 SO <br /> Valve : Aluminum and a proper connection at the <br /> Seals : Vlton® tight-fill adaptor are essential. vapor-tight Overfill Prevention Valve <br /> Delivery personnel should be is designed to prevent the overfill of <br /> Upper & lower Drop Tube : Aluminum managed and trained to inspect <br /> delivery elbows and hoses for underground storage tanks by providing <br /> Plastic parts : Acetal damaged and missing parts. a positive shut-off of product delivery. <br /> Hardware : Stainless steel They should always make The shut-off valve is an integral part of <br /> certain there is a positive 9 <br /> connection between the adaptor the drop tube used for gravity filling . <br /> Features and elbow. If delivery equipment The OPW 71 SO allows easy installation <br /> is not properly maintained, or the <br /> ♦ Simple, Easy and Quick Installation — elbow is not securely coupled (without breaking concrete) and requires <br /> P y to the adaptor, a serious spill no special manholes. <br /> no excavation or special manholes may result when the OPW 71 SO The OPW 71 SO is a va or-ti ht two- <br /> required . closes, causing a hazard and P 9 <br /> environmental contamination. stage Shut-off valve. When the liquid <br /> ♦ Economical — costs a fraction of level rises to about 95% of tank capacity, <br /> expensive, complicated and difficult- designed <br /> Ther us 71 n ti is <br /> designed for use on tight-fill the valve mechanism is released , <br /> to-install valves . gravity drop applications only. closing automatically with the flow. This <br /> ♦ Furnished Complete — supplied Do not use for pressure fill reduces the flow rate to approximately <br /> applications. PP y <br /> with new upper and lower drop tubes , 5 gpm through a bypass valve . The <br /> mounting hardware and thorough operator may then stop the filling <br /> instructions for quick job site time . process and disconnect and drain the <br /> ♦ Completely Automatic Operation — no ♦ Retrofits Directly — for both new and delivery hose . As long as the liquid <br /> prechecks to perform , no resets and no existing tanks with 4 " fill risers , exceeds the 95% level , the valve will <br /> overrides to be broken or abused . ♦ Quick Drain Feature — automatically close automatically each time delivery <br /> ♦ No Pressurization of the Tank — drains hose when head pressure is is attempted . <br /> operates directly from liquid level . relieved . If the delivery is not stopped and <br /> ♦ Will Accept a Dipstick for Gauging ♦ Best Flow Rate in The Industry* the liquid rises to about 98 % of tank <br /> capacity, the bypass valve closes <br /> completely. No additional liquid can flow <br /> Advantages of Overfill Prevention into the tank until the level drops below <br /> Compared to Overfill Warning Systems: a reset point. <br /> ♦ Completely Automatic Operation ♦ Speeds Delivery Operations — NOTE : The 71 SO Overfill Prevention <br /> — does not rely on the alertness or product flows unimpeded into the tank Valve can be adjusted to shutoff at any <br /> speed of response of the delivery until the hose "kick" that accompanies desired tank capacity. Please contact <br /> attendant for certainty of overfill the valve shut-off provides a clear the Authority Having Jurisdiction (AHJ ) <br /> prevention . signal that the liquid has reached the and review local , state , and national <br /> ♦ Keeps the Top of UST " Dry, " per shut-off level . codes to determine the regulatory <br /> EPA Requirements — eliminating requirements governing shut-off <br /> q g ♦ Simple and Inexpensive Installation — <br /> possible leaks at loose bung fittings in both two-point and coaxial fill capacity in your region , as well as <br /> and the need for double containment take into account other considerations <br /> applications , no additional excavation , <br /> on vent lines . manholes or vent piping are required . such as extreme tank tilt. In all cases , <br /> ♦ Does Not Rely on Pressure in the the upper tube must protrude into the <br /> UST to Stop Flow — allowing faster fill tank at least 6 1l2" to ensure that the <br /> times and reducing spill risk. valve can shut off flow into the tank <br /> completely before the top of the tank <br /> is wetted as per EPA requirements . <br /> Listings and 0— UlC Look for this label for <br /> authentic OPW EVR 7150 Instruction Sheet Order <br /> Certifications California Air Approved products. Number: H15524PA <br /> Resources Board ovNr� <br /> 102 9393 Princeton-Glendale Road 4 Hamilton, Ohio USA 45011 1> Phone: (800) 422-2525 > Fax: (800) 421 -3297 ©2013 OPIN Fueling Components <br />