My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4733
>
2300 - Underground Storage Tank Program
>
PR0232510
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:24 PM
Creation date
4/9/2024 11:55:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0232510
PE
2361 - UST FACILITY
FACILITY_ID
FA0003924
FACILITY_NAME
HUNT & SONS INC - STOCKTON
STREET_NUMBER
4733
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95206
APN
17930008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
4733 S HWY 99 STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A dOAQU1N Environmental Health Department <br /> CQLJNT1 AMENDED <br /> 6/18/2024 <br /> CP22 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> HUNT&SONS INC-STOCKTON 4733 S HWY 99 , STOCKTON June 06 2024 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include all <br /> of the recommendations made in the report. The operator shall submit a written response that includes a statement <br /> documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a repeat violation (Class 2) Violation. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator on the day of inspection. A complete report was <br /> finished on 6/18/2024 and replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br /> FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: June 06, 2024 Inspector: Inspector Phone: <br /> Printed Name and Title: Kristina Saetern, EHS (209)616-3045 <br /> Emailed to Robert <br /> Kendrick, <br /> Maintenance/Operator <br /> FA0003924 PR0232510 SCO01 06/06/2024 <br /> EHD Rev.12/06/2021 Page 7 of 7 CP22-UST FULL OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.