My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4733
>
2300 - Underground Storage Tank Program
>
PR0232510
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:24 PM
Creation date
4/9/2024 11:55:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0232510
PE
2361 - UST FACILITY
FACILITY_ID
FA0003924
FACILITY_NAME
HUNT & SONS INC - STOCKTON
STREET_NUMBER
4733
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95206
APN
17930008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
4733 S HWY 99 STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground{Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum CK Hydrostatic <br /> Test Equipment Used: 3viCov <br /> Sump/UDC ID 4-P %r" <br /> Sump Manufacturer <br /> r:q r60 <br /> Sump Depth (inches) " �Sb" ?�('� ,ay" <br /> Sump Bottom to Top of 1 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time f 10- 3 <br /> Final Reading 3, ���' I a i1t q�j�j # <br /> Change in Reading Oa�{'� 0 <br /> o• <br /> Pass/Fail Criteria -f /- 2.601, 1 r- zoo" ♦� r�,� " <br /> Tightness Test Results C& Pass ❑ Fail KI Pass ❑ Fail N Pass ❑ Fail Pass ❑ Fail <br /> Sump/UDC ID n4 -.*-+ voc, <br /> Sump Manufacturer F• F' <br /> Sump Depth (inches) qy 4, If <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration kel� <br /> (inches) <br /> Test Start Time ' <br /> 1.9 ' �a:14 � '•lto la: v� la'•1 O r, <br /> Initial Reading 1, g6�1r1 lyo '' If 1°Ilfa'+ <br /> Test End Time 1 ,,�,, ti ;• '' t la'•a <br /> Final Reading q � '' ty'� 1��1% ,1% +� <br /> Change in Reading p -k-0 00o5+t = a,pao of a-0Cb%" <br /> Pass/Fail Criteria -V/- 106'1 tif- a•0�+ �/ a-00 rt f- awo <br /> Tightness Test Results St Pass ❑ Fail E&Pass ❑ Fail A Pass ❑ Fail SL Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.