My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1243
>
2300 - Underground Storage Tank Program
>
PR0548639
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 3:49:01 PM
Creation date
4/10/2024 9:06:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0548639
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0027823
FACILITY_NAME
ARCO AM/PM
STREET_NUMBER
1243
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95215
APN
10816016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1243 W MARCH LN STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> Lr Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA' <br /> ® 3 GPH ® 0.1 GPH rj 0.2 GPH <br /> Has the testing apparatus been properly calibrated? Fn <br /> For emergency generator tank systems, does the LLD create an audible and visual <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ri ri r <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is ® ri rl <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the M ® 0 <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the M ❑ E <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected El <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? M M FM <br /> Were all LLDs confirmed operational within regulatory requirements? r <br /> - lfl <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> Q1 848480 87 ® ri <br /> Q2 848480 91 ® Im <br /> Q3 848480 DSL r 0 <br /> rl Fn <br /> In <br /> r Fn <br /> Fn El <br /> r Fn <br /> Describe all answers marked "No"or"Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.