Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILLPREVENTION'EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 DSL <br /> Are both vent and tank riser piping �/ Yes �/ Yes Yes Yes <br /> secondarily contained? No No No No <br /> OPE Model OPw 71SO OPw 71SO OPw 71SO <br /> What is the OPE response when activated? Shut off �/ Shut off �/ Shut off Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> Restricts Restricts Restricts Restricts <br /> Flow Flow Flow Flow <br /> Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> E]Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping Yes* Yes* Yes* Yes' <br /> that may interfere with the OPE operation? No �/ No �/ No No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 102" 99.51, 101.25" <br /> What is the percent capacity of the tank at <br /> 91.34% 90.06% 90.25% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to JVJYes 7Yes V/ Yes Yes <br /> respond when the stored substanceNo 7 No 7No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results �/ Pass �/ Pass V/ Pass Pass <br /> Fail Fail Fail Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />