Laserfiche WebLink
TanKQCtlon Report <br /> al Insp pate last <br /> Yes No NA Performed <br /> NANCe © 4-27-2023 <br /> been cornpieted within the past <br /> system certification <br /> S monitoring feted within the past <br /> 4-27-2023 <br /> 12 months? testing been comp <br /> Has spill container feted within 4_2$-2022 <br /> 12 months? ; ment inspection been comp <br /> Has over//prevention equ P <br /> the past 36 months? <br /> as secondary containment testing been completed within the past 9-13-2023 <br /> H <br /> 36 months? <br /> Has tank tightness testing been completed within required <br /> timeframes? <br /> Has line tightness testing been completed within the required <br /> timeframes? <br /> Other Test/Maintenance: 6-23-2022 <br /> Other Test/Maintenance: r <br /> Other Test/ Maintenance: rril .`` <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> veers marked "No"must be described by the designated UST operator in Section 3. <br /> All answers Page 4 of 4 <br /> I <br /> _ <br /> �z"kGAim 6 <br /> t R., <br />