Laserfiche WebLink
APS-� A� <br /> DE�E�M�N�NG LOCA�ICi, _ <br /> �aR v �INE� AND EAS« . <br /> pRapER� ; <br /> GONT�GTS: <br /> STRUGTURAI. <br /> ARCHITECTURAL ENVIRONME <br /> COVER SHEET, SITE PLAN MIKE SMITH ENGINEERING, INC . Ec <br /> P.O. 50X 611 S I <br /> ENLARGED SITE PLAN LORI, CA. `15241 <br /> ENLARGED SITE PLAN pp SAL APPRI <br /> CONTACT- MIKE SMITH OBTAINS <br /> PHONE: (2041) 334-2332 OBTAIN V <br /> let FLOOR PLAN. co DITV <br /> FAX: (2041) 334-010�Omaastblz.net RE ICS <br /> 2nd FLOOR PLAN E-MAIL: mikelllmsen <br /> EXTERIOR ELEVATIONS ELEGTRIGAL ENGINEER: w <br /> ENLARGED RESTROOM PLAN, ING. =.ate <br /> HG5 ENGINEERING, Aepeon andtdotls <br /> INTERIOR ELEVATIONS 4651 QUAIL LAKES R' deviationtromrec <br /> ROOF PLAN 5TOCKTON, GA <br /> REFLECTED CEILING PLAN CONTACT: BHUPENDRA PATEI- <br /> Room FINISH SCHEDULE, PDX I ( 1)�216�1 �O <br /> DOOR 8 WINDOW 5GHEDULES <br /> D15A8LED ACCESS STANDARDS �CHANIG <br /> 6DMD ENGINEERING, ING. <br /> 015AI ACCESS STANDAR175 212 E. PINE ST. <br /> STRUCTURAL SHEET LORI, CA. g5240 <br /> T: GREG DAV15 <br /> FOUNDATION PLAN DETAILS CONTACPHONE. (2041) 36'1-084141 <br /> ROOF FRAMING PLAN, FAX. (20°1) 36'1-OSgB <br /> MANSARD FRAMING PLAN, dmden r11 101001.net <br /> GE��N FRAMINGP � EMAIL: <br /> PLAN <br /> SEPTIC V"STPM GP�LGULATION: <br /> SECTIONS <br /> SECTIONS DAILY F T W/ y=U5LIG TOILETS <br /> SECTION FOR RETAIL MART" 2-100 G-I 5/DAY <br /> IS x 150 = 3150 GALLONS <br /> FRAMING DETAILS FOR IS FIX-1URE5I ADF 1,125 + O.?5(2"f00) _ <br /> SASE TANK CAPACITY = <br /> FRAMING DETP,ILS USE 2-IbOO 6AL. TANKS <br /> GENERAL NOTES, DEMOLITION LEACH LINES REQVI�ED (1,125 + 2,700)0.225 = 860 LF <br /> SITE 5 F8 <br /> PLAN LEACH LINE L = 280 LF <br /> ELECTRICAL LEACH5 PITS ® 60 0 = 5 X 110 = ` ql0 LF <br /> ELEGTRIGAL VIDED = <br /> GENERAL NOTES TOTAL LEACH LINE PRO <br /> SITE PLAN FUTURE FILTER SED EXPANSION AREA <br /> SITE LIGHTING IMPROVEMENTS <br /> 860 X 4 = 3,4.40 SF <br /> FIRST FLOOR LIGHTING PLANN- PLAN <br /> SECOND FLOOR LIGHTING PLAN Application Number <br /> R PLAN SPECIAL INSPECTION: <br /> FIRST FLOOR "0 1.I STATEMENT OF FOLLO $totectDescription <br /> SECOND FLOOR POW'=R PLAN <br /> PROVIDE SPECIAL INSPECTION A5 <br /> ppyyER ROOF PLAN COMPACTION Site Address7) <br /> ELEGTRIGAL DETAILS, PANELS <br /> 0) SUBGRADE Address Parcel <br /> Applicant certifies that the proper <br /> SCHEDULE ONE LINE DIAD• b) HIGH STRENGTH CONCRETE <br /> proposed asstructures <br /> shown and improve <br /> F I XTURE proposals as shown and to comp <br /> ELI DETAILS, Signed <br /> EL <br /> SCHEDULE 4 ONE LINE DIAD. Owneranu <br /> I AI TENTATIVE APPRM <br /> INTERIOR LIGHTING COMPL., ANGE -- <br /> EXTERIOR LIGHTING sv:'_, I; DATE:,_ <br /> HVAC SCHEDULOOR PETAILS <br /> HVAC FIRST FL <br /> AN <br /> HVAC SECOND FLOOR PLAN <br /> HVAC ROOF PLAN <br /> PLUMBING SCHEDULES 4 DETAILS <br /> PLUMBING FIRST FLOOR <br /> SEWER AND VENT PLAN <br /> PLUMBING FIRST FLOOR <br /> ygATER PLAN <br /> c,EGOND FLOOR <br />