Laserfiche WebLink
10. TESTING AND MAINTENANCE <br />Yes <br />No <br />NA <br />Date last <br />performed <br />Has monitoring system certification been completed within the past <br />12 months? <br />❑ <br />® <br />2023-08-08 <br />Has spill container testing been completed within the past <br />12 months? <br />® <br />❑ <br />2023-08-08 <br />Has overfill prevention equipment inspection been completed within <br />the past 36 months? <br />® <br />❑ <br />❑ <br />2021-08-05 <br />Has secondary containment testing been completed within the past <br />36 months? <br />® <br />❑ <br />❑ <br />2020-08-18 <br />Has tank tightness testing been completed within required <br />timeframes? <br />❑ <br />❑ <br />Has line tightness testing been completed within the required <br />timeframes? <br />❑ <br />❑ <br />Other Test / Maintenance: Cathodic Protection <br />® <br />❑ <br />❑ <br />2020-08-28 <br />Other Test / Maintenance: <br />❑ <br />❑ <br />❑ <br />Other Test / Maintenance: <br />❑ <br />❑ <br />❑ <br />11. FACILITY EMPLOYEE TRAINING <br />Yes <br />No <br />Have all individuals performing facility employee duties received the required <br />employee training within the past 12 months? <br />facility <br />® <br />❑ <br />13. COMMENTS <br />All answers marked "No" must be described by the designated UST operator in Section 3. <br />Page 4 of 9 <br />