Laserfiche WebLink
Underground Storage Tank <br />Designated UST Operator Visual Inspection Report <br />10. TESTING AND MAINTENANCE <br />Yes <br />No <br />NA <br />Date last <br />performed <br />Has monitoring system certification been completed within the past <br />12 months? <br />❑ <br />® <br />2023-08-08 <br />Has spill container testing been completed within the past <br />12 months? <br />® <br />❑ <br />2023-08-08 <br />Has overfill prevention equipment inspection been completed within <br />the past 36 months? <br />® <br />❑ <br />❑ <br />2021-08-05 <br />Has secondary containment testing been completed within the past <br />36 months? <br />® <br />❑ <br />❑ <br />2023-08-16 <br />Has tank tightness testing been completed within required <br />timeframes? <br />❑ <br />❑ <br />Has line tightness testing been completed within the required <br />timeframes? <br />❑ <br />❑ <br />Other Test / Maintenance: <br />❑ <br />❑ <br />❑ <br />Other Test / Maintenance: <br />❑ <br />❑ <br />❑ <br />Other Test / Maintenance: <br />❑ <br />❑ <br />❑ <br />11. FACILITY EMPLOYEE TRAINING <br />Yes <br />No <br />Have all individuals performing facility employee duties received the required facility <br />employee training within the past 12 months? <br />® <br />❑ <br />13. COMMENTS <br />All alarms occurred due to annual testing, monitoring panel is currently in <br />sensor <br />alarm due to bad annular <br />A11 answers marked "No" must be described by the designated UST operator in Section 3. <br />Page 4 of 10 <br />