My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2026 6:48:40 PM
Creation date
4/19/2024 1:32:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0505264
PE
2361 - UST FACILITY
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1501 N JACK TONE RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ver. 1.3 – 08.07.09TP-201.1C/DLeak Rate of Drop Tube/Drain Valve Assembly and Leak Rate of Drop Tube Overfill ProtectionDevices and Spill Container Drain Valves Report FormPermit Number: Test Company:Site Name: Technician:Site Address: Certification Number Expiration DateCity: Zip: District:Date/Time of Test:DROP TUBE DRAIN VALVE AND OVERFILL PROTECTION DEVICE PRESSURE INTERGITY TESTStraight Drop Tube1Drop Tube with an Overfill Protection Device2Pressure measuring devicedigitalmanometermechanical gaugeCalibration date for pressure measuring device (must be within 180 days of the test)Ending value for digital manometer drift test if applicable (must be 0.01 in. w.c. or less) Drop Tube Drain Valve Pressure Test:Flow rate 80 ml/minDrop Tube Overfill Device Pressure Test:Flow rate 200 ml/min“Corrected” Overfill Device Leak RateTime to reach 2 in.w.c. at 80 ml/minDrain valveleak rate3FinalpressureTime to reach 2 in.w.c. at 200 ml/minOverfillleak rate3FinalpressureOverfillDeviceLeak RateMinus EqualsDrain ValveLeak RateCorrectedLeak RateTank Grade mins. ml/min in. w.c. mins. ml/min in. w.c. ml/min ml/min ml/min1234NOTES:1A straight drop tube must be tested with a bladder in place and using a flow rate of 80 ml/min.2The bladder section of TP-201.1D may be skipped if the entire drop tube passes with a leak rate below 80 ml/min.3Leak rate = nitrogen flow rate needed to maintain a constant pressure (at least 2 in. w.c.) for 30 seconds.I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, thestatements and information provided in this document are true, accurate, and complete.Signature of Technician: ___________________________ Date: ____________________Jones Covey GroupPilot Flying J 618 Ripon Shawn Rodriguez1501 N. Jack Tone Rd.Ripon 95366 SJV-0308 06/30/202509/19/2024 @10:25am07/11/20240.00"w.c.87 3 Mins 18 Sec 0.00 ml 1.98" w.c.91 2 Mins 42 Sec 0.00 ml 2.01" w.c.09/19/2024
The URL can be used to link to this page
Your browser does not support the video tag.