My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0087736_SSCR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
2600 - Land Use Program
>
SR0087736_SSCR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:09 PM
Creation date
5/1/2024 2:46:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCR
RECORD_ID
SR0087736
PE
2603
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
05926010
ENTERED_DATE
2/20/2024 12:00:00 AM
SITE_LOCATION
11396 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Drift Minimization, Continued <br /> II. GROUND <br /> A. Vehicle-mounted or towed ground equipment, other than handguns, used to make <br /> applications shall be equipped with: <br /> 1. Nozzles having an orifice not less than one-sixteenth of an inch in diameter(or <br /> equivalent)and operated at a boom pressure not to exceed the manufacturer's <br /> recommended pressure for the nozzles being used; or <br /> 2. Low-pressure fan nozzles with a fan angle number not larger than 80 degrees and nozzle <br /> orifice not less than 0.2 gallon per minute flow rate (or equivalent)and operated at a <br /> boom pressure not to exceed 15 pounds per square inch. <br /> B. Applications of a pesticide spray solution made by vehicle-mounted or towed ground <br /> equipment shall meet the following requirements: <br /> 1. Apply only when wind speed is ten miles per hour or less at the application site, as <br /> measured by an anemometer positioned four feet above the ground. <br /> 2. Discharge shall start after entering the target site; discharge shall be shut off before <br /> exiting the target site. <br /> (Rev.2-11) C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.