Laserfiche WebLink
5/30/24, 10:31 AM GeoTracker <br /> GEoTRACKER <br /> (T0607700708) - SIGN UP •- <br /> 11396 HWY 99 N CUF Claim#:10934 CUF Priority Assigned•C CUP Amount Paid:$661,001 CLEANUP OVERSIGHT AGENCIES <br /> LODI,CA 95240 CUF Claim#:15089 CUF PriorityAssigned:C CUF Amount Paid:$39,593 SAN JOAQUIN COUNTY(LEAD)-CASE#:1627 <br /> SAN JOAQUIN COUNTY CENTRAL VALLEY RWQCB(REGION 5S)-CASE <br /> LUST CLEANUP SITE.(I N FO) CASE MANAGER:ALAN M.BUEHLER <br /> COMPLETED-CASE CLOSED AS OF 3/28/2013-DEFINITION <br /> PRINTABLE CASE SUMMARY I CSM REPORT <br /> Summary Case Reviews Cleanup Action Report Regulatory Activities Environmental Data(ESI) Site Maps I Documents Community Involvement Related Cases LUST CUF Data <br /> Regulatory Profile PRINTABLE CASE SUMN <br /> CLEANUP STATUS-DEFINITIONS <br /> COMPLETED-CASE CLOSED AS OF 3/28/2013 -CLEANUP STATUS HISTORY <br /> POTENTIAL CONTAMINANTS OF CONCERN POTENTIAL MEDIA OF CONCERN <br /> GASOLINE AQUIFER USED FOR DRINKING WATER SUPPLY <br /> FILE LOCATION DESIGNATED GROUNDWATER BENEFICIAL USE -DEFINITIONS <br /> LOCALAGENCY MUN,AGR,IND,PROC <br /> DWR GROUNDWATER SUB-BASIN NAME CALWATER WATERSHED NAME <br /> San Joaquin Valley-Eastern San Joaquin(5-022.01) North Valley Floor-Lower Mokelumne(531.20) <br /> Post Closure Site Management Requirements <br /> DAY CARE CENTER PROHIBITED <br /> ELDER CARE CENTER PROHIBITED <br /> HOSPITAL USE PROHIBITED <br /> NO EXCAVATION OF CONTAMINATED SOILS WITHOUTAGENCY REVIEW AND APPROVAL <br /> NO GROUNDWATER EXTRACTION AT ANY DEPTH WITHOUT APPROVAL <br /> NOTIFY PRIOR TO CHANGE IN LAND USE <br /> NOTIFY PRIOR TO SUBSURFACE WORK <br /> PERFORM H&S PLAN PRIOR TO SUBSURFACE WORK <br /> Future Land Use Reported at Closure <br /> COMMERCIAL <br /> INDUSTRIAL <br /> Site History <br /> «««<»»»»Site is large trucking yard with history of diesel fueling and truck repair.February 1995 irreconcilable difference of 970 gallons of gasoine reported.The gasoline U: <br /> removed March 1995.Contamination noted in soil sample from under UST.Site enters EHD-LOP June 1995.Soil excavation and—300 cubic yards removed.Four monitoring wells <br /> installed onsite from December 1995 to August 1998.One diesel UST removed May 1999.MtBE contaminant of concern with gw impact as high as 150,000 ug/I.TPHg also detected <br /> beginning March 2008.June 2008:only MW-1 with gw,all others dry.2 onsite drinking water wells within 150'of UST pit.November 2002 one domestic well properly destroyed.SVE/I/ <br /> goes online 2009.Site still trucking yard,no fuel dispensed.3-23-2010:gw up,all wells have gw and lab verifies all ND.4-20-2010:EHD approves MW-1 to SVE system in letter and <br /> requests vapor intrusion eval.12-21-10:EHD approves Work Plan to sample AS wells for gw data.Sep 20,2011:NFAR submitted to the EHD.review pending.Nov 14,2011:EHD ad, <br /> RP of IN FAR review delay.«««««<»»»»> <br /> Back to Top Conditions of Use <br /> PolicyPrivacy <br /> Contact Us <br /> Copyright O 2024 <br /> https://geotracker.waterboards.ca.gov/profile_report.asp?global_id=T0607700708 1/1 <br />