Laserfiche WebLink
Underground Storage Tank <br />Designated UST Operator Visual Inspection Report <br />10. TESTING AND MAINTENANCE <br />Has monitoring system certification been completed within the past <br />iz months? <br />Has spill Container testin4g beer. con feted within tli(..,. pzist 12 <br />nionths'? <br />Has overfill prevention equipment inspection been completed <br />within the past 36 months? <br />Has secondary containmenttesting beer) completed within the past <br />36 months? <br />- -- - ------ <br />Has tanl< tightness testing been completed within required <br />Has line tightness testing been completed within the required <br />timeframes"? <br />Other Test / Maintenance,. <br />yes No NA Data last <br />performed <br />.. <br />9 ... .... . <br />-S--23 <br />5-9-23 <br />,-a-/ I -A F1 5-17-21 <br />F] I F-1 1 0 <br />[:1 1 11 1 L-1 <br />Other lest Maintenance, FA H 11 <br />Other Test Maintenance, <br />11. FACILITY EMPLOYEE TRAWNG 5-17-23 Yes es <br />Have all individuals performing facility employee duties received the required facility <br />employee training within the past 12 ma., n; hs? <br />13. COMMENTS <br />.. . . ...... . <br />-l"his section may be used to record cornments or observations that are not current compliance <br />deficiencies. <br />No <br />x <br />All unswei'S mai-ked "'No" a-gl5*1-ci je F a on <br />L 0 U scrlbed L,ly tf-ie desigooted 05)1 I - oper tor io j5ecti -3 ). <br />4 <br />