Laserfiche WebLink
Underground Storage Tank ■ <br /> Desi Underground <br /> UST Operator Visual Inspection Report <br /> 'lumber DESCRIPTIONFOLLOW-UP ACTION <br /> er the follow u pOF p <br /> p actions to corres and to a propriate compliance issues from Section 3 <br /> 6. OWNER / OPERATOR ACKNOLEDGEMENT OF INSPECTION RESULTS <br /> Wrovided a <br /> 1 have reviewed the results of the designated UST operator inspection report and p <br /> description of the actions taken or to be taken to correct any compliance issues discovered. <br /> Name of UST Owner/ Operator (print) <br /> UST Owner/0 erat r Signatu Date Signed <br /> 7. INSPECTION ORYNI <br /> Has each follow-up action of Section 3 from the previous Designated UST <br /> Yes No <br /> Operator Inspection Report been completed appropriately? <br /> Attach documentation verifying appropriate service to this report.) <br /> 8. RELEASE DETECTION ALARM HISTORY Yes No <br /> Attach a copy of the alarm history report/log to this report. ❑ <br /> Is the monitoring system powered on and in proper operating mode? <br /> Has each alarm since the previous inspection been responded to appropriately? 0 0 <br /> (Attach documentation verifying appropriate service to this report.) <br /> Have all containment sumps, that have had an alarm since the previousdesignated UST operator inspection report, been responded to by a qualified <br /> service technician? <br /> A// a <br /> rrswers marked "No"must be described by the designated UST operator in Section I <br /> P ac <br />