Laserfiche WebLink
N._ r <br /> Underground Storage Tank <br /> Designated UST Operator Visual Inspection Report <br /> Date last <br />=N Yes No NA performed <br /> 10. TESTING AND MAINTENANCE <br /> N(A(A ❑ <br /> E Has monitoring system certification been completed within the pas <br /> 12 months? <br /> Has spill container Has been completed within the past �( 13 <br /> 12 months? 0 <br /> Has overfill prevention equipment inspection been completed within El 5/19/2021 <br /> the past 36 months? <br /> Has secondary containment testing been completed within the past ❑ 2/1/2022 <br /> 36 months? <br /> Has tank tightness testing been completed within required ❑ ❑ X <br /> timeframes? <br /> -- <br /> Has line tightness testing been completed within the required ❑ ❑ X <br /> timeframes? <br /> Other Test/Maintenance: El 11 <br /> Other Test/Maintenance: ❑ ❑ ❑ <br /> Other Test/Maintenance: ❑ ❑ ❑ <br /> 11. FACILITY EMPLOYEE TRAINING Yes No <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? <br /> 13. COMMENTS <br /> This section may be used to record comments or observations that are not current compliance <br /> deficiencies. <br /> Inswers marked "No" <br /> must be described by the designated US operator in Slsctinn <br />