Laserfiche WebLink
Location:CGRS Project No : <br />Test Date: <br />CGRS Techs: <br />IOTA Tech Signature: <br />Sergio L. Nunez CA Tank Tester #06-1727 <br />Reviewed by: <br />Chris Murphy Director of CA Services <br />E85 Vent PASS <br />VR PASS <br />Diesel Vent PASS <br />E85 PL PASS <br />87 Vent PASS <br />8/23/2023 <br />Date <br />DSL PL PASS <br />8/18/2023 <br />Date <br />Bio-Diesel PL PASS <br />Bio-Diesel Vent PASS <br />91 Vent PASS <br />87 PL PASS <br />91 PL PASS <br />COMPONENTS RESULTS <br />Piping Secondary Communication Confirmation <br />16460 Golden Valley Parkway Sergio L. Nunez <br />Lathrop, CA 95330 <br />Secondary Flow Communication Test Certification <br />61-27352 <br />Chevron August 18, 2023 <br />CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed <br />throughout the secondary piping components listed below.