Laserfiche WebLink
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for Nashir Hunter Inc. as of July 11, 2024. <br /> Open violations from May 29, 2024 inspection <br /> Violation#30-2060015-Leak detection equipment located so leak is detected at the earliest possible <br /> opportunity(TCR 9d). <br /> OBSERVATION: The 87 sensor was raised approximately 7 inches off the lowest point of the sump and not located to <br /> detect a leak at the earliest opportunity. <br /> REGULATION GUIDANCE: Monitoring equipment shall be maintained to be able to detect a leak at the earliest <br /> possible opportunity. <br /> CORRECTIVE ACTION:The sensor was relocated to the lowest point of the sump by the service technician. Ensure <br /> that all monitoring equipment is maintained and located to detect a leak at the earliest opportunity. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#31 -2030062-Leak detection equipment has not been tampered with or disabled (TCR 9d). <br /> OBSERVATION: The 87 STP sump was observed with approximately 3.5 inches of liquid inside along with the sensor <br /> approximately 7 inches off the lowest point of the sump and not located to detect a leak at the earliest opportunity. <br /> REGULATION GUIDANCE:An operator of an underground storage tank system shall not allow tampering with or <br /> otherwise disabling automatic leak detection devices or alarms. <br /> CORRECTIVE ACTION: Immediately place the sensor at the lowest point of the sump and maintain the monitoring <br /> system in proper operating conditions at all times. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#53-2010007-Submitted/maintained current Cert of Financial Responsibility/mech of financial <br /> assurance(TCR 11). <br /> OBSERVATION: Current financial responsibility documents were not found on site. <br /> REGULATION GUIDANCE:A copy of current financial responsibility documents are required to be maintained on site. <br /> CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br /> copy on site. <br /> Page 1 of 4 <br />