My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2024 3:53:20 PM
Creation date
5/14/2024 9:57:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2022
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-9 <br />Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - August 2019January 2022 <br />z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2019-2020\rcsi 2019\text\sec 3.doc <br />pumped at a rate of approximately 1 ,500 gpm at a maximum frequency of approximately 27 <br />times in a typical work day. Another well is locat ed south of the South Fork of South <br />Littlejohn’s Creek , in the southeast corner of the RRF/Compost Facility area, and has a <br />capacity of 500 gpm. The third well is located along the northern boundary of the former <br />Austin Road Landfill. This well was insta lled in 1972 and has a production of approximately <br />60 gpm. The fact that groundwater flow near the existing Forward Landfill is not modified by <br />pumping from this well suggests that it is screened in a confined unit below the uppermost <br />groundwater units that are monitored at the site. The fourth production well is located along <br />the eastern boundary of the site, just south of the entrance to the RRF/Compost Facility. <br />The locations of the wells located in the RRF/Compost Facility area is shown on Figure 2. <br />Water uses include site construction and waste disposal operations, RRF /Compost Facility <br />operations, dust control, equipment maintenance operations, sanitary facilities, firefighting, <br />and emergency situations. <br />c. Preprocessing Procedures <br />Preprocessing will include inspecting the incoming material to remove any visible <br />contaminants. Loads will be visually inspected in the material sorting area at the Compost <br />Facility (see Figure 2). A magnetic separator is used to extract nails and other ferrous <br />contaminants from the green waste material after it has been shredded. <br />d. Process Time <br />As discussed in Section 1.3.1, the Compost F acility is designed and permitted to process up <br />to 1,100 tpd of waste.compostable materials. The specific capacity depends on t he <br />composting process being used, density of materials, and the quality of compost product. <br />The active windrow compost process time is between approximately 4 to 12 weeks, <br />depending on the compost product quality. The windrow curing process takes from <br />approximately 1 to 6 months. The ASP composting process time is approximately 8 weeks. <br />e. Chemical or Bulking Agents <br />As previously mentioned, amendments and/or additives are not currently utilized at the <br />RRF/Composting facility. In addition, any oversize d screened materials are landfilled.Prior <br />to use of amendment and/or additives, Forward will obtain approval from the LEA and <br />Regional Water Quality Control Board. <br />3.5.3 Climatic Conditions <br />Climatic conditions are not expected to adversely affect site operations. It does not snow <br />but can occasionally freeze at the site. Forward implements a winterization program each <br />year to prepare the internal roads for all weather access during the rainy season (October <br />through April). <br />The climate of the region is typical of the California Central Valley. Winters are generally cold <br />and wet with fog, while summers are hot and dry. <br />Climatological data used in the site design was gathered from representative weather <br />stations near the site. Representative climatologic stations were selected based on their <br />proximity to the site and a reliable period of records for the station. <br />Temperature. Summer high temperatures often exceed 100 °F, averaging from the low 90’s <br />in the northern part of the valley to the high 90’s in the south. The daily summer
The URL can be used to link to this page
Your browser does not support the video tag.