Laserfiche WebLink
<br />COMPOST FACILITY STORM WATER IMPROVEMENTS 4-1 <br />SECTION 4 Summary <br />This report presents the construction documents and supporting design criteria required for <br />completion of the Compost Facility Stormwater Improvements at the Forward Landfill. Design <br />calculations have been performed and construction documents prepared to demonstrate that the <br />design complies with Forward’s WDRs and Title 27 requirements. <br />These Design and Construction Documents have been prepared under the supervision of Sangeeta P. <br />Lewis, whose seal as a Registered Professional Engineer in the State of California is affixed below. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />_________________________________________ <br /> <br />SANGEETA P. LEWIS RCE 47735