Laserfiche WebLink
Forward Resource Recovery Facility WDR Technical Report <br /> <br />HDR Engineering, Inc. 13 October 2021 <br /> <br />6.0 Compliance Schedule (Existing Facilities <br />Only) <br />6.1 Compliance Schedule <br />This facility is an existing facility, but based on the information provided in this Technical Report <br />is compliant with the design criteria required by the General Order. Should it become known that <br />an aspect of the facility as described here is not in compliance with the General Order, the facility <br />shall resolve the design issue and meet the General Order requirements within one year of the <br />issue becoming known. <br />