Laserfiche WebLink
On Thu, Aug 24, 2023 at 7:50 AM Fahmy, Gehane [EHD] <gfahmy(&,sigov.org> wrote: <br />Hi Aaron, <br />We don't do preconstruction meetings. <br />The plans are now at the second review. Please make sure, as mentioned in previous email, that the water heater is <br />meeting the minimum requirement 102,000 BTU. For the proposed floor finish schedule, it is approved by our Program <br />Coordinator. Please let the contractor stick to it. <br />When the plans are ready and the letter is prepared, they will be emailed to the requestor. <br />Regards, <br />igI Fahmy, REgis <br />San Joaquin County <br />2