My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
770
>
2300 - Underground Storage Tank Program
>
PR0546068
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:56:19 PM
Creation date
5/22/2024 4:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0546068
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026052
FACILITY_NAME
7-ELEVEN STORE #41216
STREET_NUMBER
770
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323023
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
770 W CHARTER WAY STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7154-7001LC PROCEDURE SEWW, <br />FOR 71 S4TOOL. SO PAGE $ <br />FOR 71506TQOLCT, SEE PAGE 10 <br />WC, TtSC�itD+(7l.Cceri onfyb t used tuft" %CM"bk <br />overfill valves if rnordlfwd its shown below. <br />.:f <br />A a TQ 24 UluC thread at cirntiar <br />to all three legs of the 7 i 5th <br />TQQI c in the are,1 sfvwn. Use set <br />sve ws to secure W to upper <br />tube. <br />STEP 9�: lftS'ERT 7'1 S�'n04LC (D1lrl�{ INLET TUBE <br />Ta irysa�ll d -,e 715t1TOc�i_+C f�t}Id selaalately? over the <br />inir~t tube, first loosen the thumb screw, W 6& tool can <br />pass fm* over the inlet tube fla age. Align the xlot on <br />the too with the key on the inlet tube and insert the <br />tool down. Set Floum 99 <br />k <br />tbum b <br />WrW <br />Laou n <br />tool StOt k. [' <br />YUIx <br />kty <br />Nark9hlen thumb crew <br />STEP 1 fab: 'iiG1i7'�N THE 71 �aiOaLC <br />FJrsure xh�t the Coal Beau flat against the top of the inter <br />rube. To prevent vertical movement of the tool durmq <br />drllling, hand tigliwn the thumbscrew against the up- <br />PCC ,drag tube. Ste tip$, <br />1EP I 10 PREPARE LMIUAHD11ff <br />Confirm [hat the stap on the 3/16' c ii Eft Wppffed <br />with the 7150)-TOOLC is in the correct po5itiort before <br />drilling. The stop is factory installed ata distance be- <br />trr+ren 1-3116` 140 7-114" frodm V lip with d r>e 715Q- <br />TUGLC. If the stop is not at the correct po5W)on it must <br />fixed before drilling.CAU7<>it]TI: If thv drill stop lis not In i*w proper Iot:a- <br />tlon failure of apressmre decay talk west mmaynmuhL <br />7151'�'TaDOLC <br />Tp to stop dimensbn must <br />t* "-3116" to Iw114` <br />STF.Pt�B: L�RiI,LHOiES <br />Withthe inletttabe and 7150-TODLC in plar*,+carefulfy <br />ctrili a 3116x` dia motet We in sfhe upper tube uarrg the <br />ltiale in the 71 SO-TOOLC as a guide. The drill stop is po- <br />slkioned so it will battom out against the stool after the <br />bit has drilled through the upper drop tube. If the stop <br />is positioned wrung either no bu4 w�1 he drilled, ora <br />through We c,c Wd potentially be drilled through the <br />inlet tul>e. If na hole is di ied rMrn to step 113 and <br />Check the scop dimensrorr. If a hole �s drWed throughthe inlet tube or into the screw hole the assernbty is mt <br />salvageable_ Drill (2) more holes in the two remairhing <br />gtZide holes. <br />pit dW �h WD�r qlF� JY� <br />G7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.