My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
770
>
2300 - Underground Storage Tank Program
>
PR0546068
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:56:19 PM
Creation date
5/22/2024 4:56:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0546068
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026052
FACILITY_NAME
7-ELEVEN STORE #41216
STREET_NUMBER
770
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323023
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
770 W CHARTER WAY STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP i3: DImmeFIM HOLE <br />R�rnove taal. RQM0V t Ahny (hips ar burrs from rrie d nW <br />img aperation. place the assembly an a solid surface. <br />Using the punch supplied with the 71S0=100L4 71 SO- <br />ro(xc, and 715() TDDLCt, align the tip of the punch <br />with the drilk5d hole and dimple tt>e upper drop tube by <br />striking the punch with a hammer until theilrop tube is <br />forayed into countersunk hole in tM inlet tube. After <br />punching, remove any chops that may have fallen into <br />the inlet Lui}e screw hale. <br />Figur T 3 <br />IEP 'I4: ASSEMBi.IE FIIt5T SiitEW <br />Ensure that ti►e rirop tube was formed into tha tau nter- <br />sunk Str+2w hole as sn In Figure 14 if rhos rett,m 40 <br />Step 13. Apply black m4iy grease to screw and tighten <br />first screw Inv Inlet tuts with a screwdriver. Use only <br />the tapRite screws that a re supplied with the unit Seat= <br />iro.9 torque Is 20 irl--lbs rein, tri 35 irwlbs wx, Screw head <br />should be flush with *PL% draptube, C)o not over tlgW <br />en, <br />Ff�ut�e t�4 <br />H+'�r"�il <br />5TfE ISS [HMPLEREM M1NINGHOLES <br />Remove any cfilps nr burrs (mm the drilling operation. <br />Dimple the next i2j holes as dome in Step 11 Make sure <br />the assembly is ort a solid surface whet+ pturwhirvg. After <br />pun&ir q, temo ve any chips that may have fallen into <br />rhe in1eR tube ZrLF +" little. <br />Allgrr punrri with <br />drilled We <br />��uni► tS <br />ST�F 1 G; AS SSE OTHER SCf*M <br />AA0Y black mc* 9rea5r t0 screws a nd <br />tighten the Oth- <br />er iZ) screws into inlet 1"rw with a scrvwwrrer w done <br />lr# Step 1 ¢. Use only the ml)tite screws that are supplied <br />+with Ltwe unit. 5eazing torque is 20 inAtrs min, to 35 in - <br />lbs Max. Da not over t}ghten. <br />STIrP'M7: 11ppL,Y CMU EASETO LfV <br />WBt Q-i1iiMG 11ND <br />t3(}DY THREAD <br />ApPty black Moly grease to the tower tube O-ring and <br />body threads as shown. Make sura coverage 15 COM- <br />pietely around the p -ring. Irts'f'aill o�rirMj in groo+re just <br />aYw <br />threads. <br />r r• <br />f <br />�ur+r 1 <br />7 <br />+�PPIY grease <br />irouh� [r-ri[tlj <br />it <br />
The URL can be used to link to this page
Your browser does not support the video tag.