Laserfiche WebLink
Vapor Keaavery <br />QPW <br />Ball Float <br />Tube Cut <br />per Local <br />i{equiren <br />FIII K1W <br />:.f <br />7 4" AAi nim urn <br />clearance for <br />Float <br />�.-- Allyn Float ,along f_erfgth of sa rdc � 5` <br />rijurn 24 A <br />A, <br />�r�ttC socket <br />Idgtvr tae- <br />eenlack <br />rew b*5 <br />Ft�RT£S'CABk.>:1410DlE:itraUNLY= Chetkir��llaii4rr <br />ai}ain as done in Step 23 to ensure poppet actuates and <br />resets properly, See page 17 for full testing details_ Ap- <br />ple pipe dope to the socket adaptor threads. Pipe dope <br />should be a norrrhardening gasogrre resistant pipe <br />tfiread seal compound. Install socket adaptorand <br />torque to 3.5 ftabs (42 in-)bsj minImum to S.g ft4bs (60 <br />in-Ibs) maximum. After installing sodwt adaptor where <br />required, pressure test testable overfill valve per CARR <br />TP201 A D tea ensure vaWo is vapor Might, <br />15 <br />