My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKHEED
>
1941
>
2300 - Underground Storage Tank Program
>
PR0231891
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 3:59:25 PM
Creation date
5/29/2024 2:27:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0231891
PE
2361 - UST FACILITY
FACILITY_ID
FA0003674
FACILITY_NAME
BANK OF STKN AIRPORT HANGAR #3
STREET_NUMBER
1941
Direction
E
STREET_NAME
LOCKHEED
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1941 E LOCKHEED CT STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />6. TANK SECONDARY CONTAINMENT TEST <br />Test Method Developed by ❑ Manufacturer N Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ®Vacuum ❑Hydrostatic <br />Test Equipment Used: Vacuum Pump/Vacuum Gauge in Hg. <br />Tank ID Jet A <br />Tank Manufacturer O C Tank <br />Tank Capacity 12K <br />Test Start Time 8:55 <br />Initial Reading -10" Hg. <br />Test End Time 9:55 <br />Final Reading -10" Hg. <br />Change in Reading 0" Hg. <br />Pass/Fail Criteria No Loss <br />Tightness Test Results N Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail 1 ❑ Pass ❑ Fail <br />7. PIPE SECONDARY CONTAINMENT TEST <br />Test Method Developed by ❑ Manufacturer N Industry Standard ❑ Professional Engineer <br />Test Type N Pressure ❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Additional copies of this page maybe attached. <br />All <br />" <br />tests marked Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page <br />2of5 <br />Pipe Run ID <br />1 -Jet A -Sup. <br />2 -Jet A -Ret. <br />3 -Jet A -Vent <br />Pipe Manufacturer <br />Smith <br />Smith <br />Smith <br />Test Start Time <br />8:50 <br />8:50 <br />8:50 <br />Initial Reading <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time <br />9:50 <br />9:50 <br />9:50 <br />Final Reading <br />5 Psi <br />5 Psi <br />5 Psi <br />Change in Reading <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Criteria <br />No Loss <br />No Loss <br />No Loss <br />Tightness Test Results <br />N Pass ❑ Fail <br />N Pass ❑ Fail <br />N Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page maybe attached. <br />All <br />" <br />tests marked Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page <br />2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.