Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> 1 2 3 4 <br /> Tank ID (one OPE per column) <br /> Are both vent and tank riser piping Yes Yes Yes Yes <br /> secondarily contained? r No r No r No r No <br /> OPE Model Emco Wheaton Emco Wheaton Emco Wheaton Emco Wheaton <br /> V Shut off V Shut off V Shut off V Shut off <br /> Flow Flow Flow Flow <br /> ' Restricts ' Restricts ' Restricts ' Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) '- Audible ' Audible ' Audible ' Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual ' Visual ' Visual ' Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? l: No No No No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 85.625 85.5 <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 94.3 94.2 <br /> Is the OPE in proper operating condition to r Yes Yes r Yes r Yes <br /> respond when the stored substance reaches r No r No a- No No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results r Pass a Pass r Pass r Pass <br /> r Fail r Fail r- Fail r- Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Was not able to test Drop tubes on Prem. And DSL spill buckets were on to tight was called into the office. <br /> *Mark here if: <br /> ''- Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />