My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
147
>
2300 - Underground Storage Tank Program
>
PR0232353
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 11:05:24 AM
Creation date
6/5/2024 9:37:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0232353
PE
2361 - UST FACILITY
FACILITY_ID
FA0003789
FACILITY_NAME
TWO GUYS FOOD & FUEL
STREET_NUMBER
147
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19608071
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
147 E LATHROP RD LATHROP 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 4 of 5 <br />Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☐ Professional Engineer <br />Test Type ☐ Pressure ☐ Vacuum ☐ Hydrostatic <br />Test Equipment Used: <br /> <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br /> <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail <br /> <br />Sump/UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br /> <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail <br /> <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST (continued)
The URL can be used to link to this page
Your browser does not support the video tag.