Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />10 LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) Yes No NA <br />p 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />Has the testing apparatus been properly calibrated? ❑ ❑ <br />For emergency generator tank systems, does the LLD create an audible and visual ❑ El02alarm when a leak is detected? <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a ❑✓ ElElrelease is detected? <br />For electronic LLDs, does the turbine automatically shut off when a release is ❑ ❑ 0 <br />detected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ 0 <br />monitoring system is disabled or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ ❑ ✓❑ <br />monitoring system malfunctions or fails a tightness test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected ❑ ❑ 0 <br />for kinks and breaks? <br />Were all items on the equipment manufacturer's maintenance checklist completed? ❑✓ ❑ ❑ <br />Were all LLDs confirmed operational within regulatory requirements? ❑✓ ❑ ❑ <br />LLD ID <br />LLD Model <br />Lines Monitored <br />Pass <br />Fail <br />87 <br />STP MLD <br />87 <br />❑ <br />91 <br />99 LD 2000 <br />91 <br />0 <br />❑ <br />DIESEL <br />STP MLD -D <br />DIESEL <br />0 <br />❑ <br />DIESEL A <br />116-056 <br />DIESEL <br />0 <br />❑ <br />DIESEL B <br />99 LD 2000 <br />DIESEL <br />0 <br />❑ <br />RED DIESEL <br />STP MLD <br />RED DIESEL <br />0 <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Describe all answers marked "No" or "Fail" and proposed remedy in Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Page 4 of 6 <br />