My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1777
>
2300 - Underground Storage Tank Program
>
PR0232397
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2026 7:43:09 PM
Creation date
6/10/2024 4:41:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0232397
PE
2361 - UST FACILITY
FACILITY_ID
FA0003978
FACILITY_NAME
KAISER FOUNDATION - MANTECA
STREET_NUMBER
1777
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20018034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1777 W YOSEMITE AVE MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71SO-TOOLC PROCEDURE BELOW, <br />FOR 71 SO -TOOL, SEE PAGE 8 <br />STEP 913: INSERT 71SO-TOOLC OVER INLET <br />TUBE <br />To install the 71SO-TOOLC (sold separately) over <br />the inlet tube, first loosen the thumb screw, so the <br />tool can pass freely over the inlet tube flange. Align <br />the slot on the tool with the key on the inlet tube and <br />insert the tool down. See Figure 913. <br />Tool Slot Hand tighten thumb <br />0 <br />screw <br />0 0 <br />O <br />O o <br />a <br />Loosen <br />thumb <br />screw O <br />Inlet <br />Tube <br />Key <br />Figure 9 <br />Figure 10 <br />STEP 1013: TIGHTEN THE 71SO-TOOLC <br />Ensure that the tool seats flat against the top of the <br />inlet tube. To prevent vertical movement of the tool <br />during drilling, hand tighten the thumb screw against <br />the upper drop tube. See Figure 1013. <br />STEP 11 B: PREPARE DRILL AND BIT <br />Confirm that the stop on the 3/16" drill bit supplied <br />with the 71 SO-TOOLC is in the correct position <br />before drilling. The stop is factory installed at a <br />distance between 1-3/16" to 1-1/4" from the tip with <br />the 71 SO-TOOLC. If the stop is not at the correct <br />position it must be fixed before drilling. <br />Caution: If the drill stop is not in the proper <br />location failure of a pressure decay leak test may <br />result. <br />Figure 1113 <br />STEP 12B: DRILL HOLES <br />With the inlet tube and 71 SO-TOOLC in place, <br />carefully drill a 3/16" diameter hole in the upper tube <br />using the hole in the 71 SO-TOOLC as a guide. The <br />drill stop is positioned so it will bottom out against <br />the tool after the bit has drilled through the upper <br />drop tube. If the stop is positioned wrong either no <br />hole will be drilled, or a through hole could <br />potentially be drilled through the inlet tube. If no <br />hole is drilled return to step 11 and check the stop <br />dimension. If a hole is drilled through the inlet tube <br />or into the screw hole the assembly is not <br />salvageable. Drill (2) more holes in the two <br />remaining guide holes. <br />Figure 12B <br />Drill through upper tube only <br />M' <br />
The URL can be used to link to this page
Your browser does not support the video tag.