Laserfiche WebLink
URS <br /> Mr.Robert McClellon <br /> October 31,2012 <br /> Page 2 <br /> monitoring wells were installed at the site on June 12, 2006. Following the installation of the ground- <br /> water monitoring wells, groundwater samples were collected quarterly and analyzed for VOCs. Mr. Ross <br /> Atkinson of the Regional Water Quality Control Board(RWQCB), Central Valley Region, requested <br /> that groundwater samples be collected and analyzed for metals and general minerals(only total dissolved <br /> solids [TDS] after the first event)starting in 4Q06. In a meeting on May 24,2007,Mr. Atkinson <br /> concurred with the recommendation in the Quarterly Monitoring Report dated April 30, 2007, to suspend <br /> the groundwater monitoring activities for VOCs. <br /> In the IQ I letter report to SJCEHD dated April 29, 2011, URS recommended reducing the frequency of <br /> the monitoring activities from quarterly to annually. SJCEHD agreed with URS' recommendation. The <br /> annual monitoring activities are usually conducted during the fourth quarter of each year, At the request <br /> of Ms. Subbotnikova of SJCEHD,the annual monitoring activities for this year were conducted during <br /> the third quarter. <br /> In a letter to RWQCB dated May 20,2011,URS recommended no further action for groundwater <br /> activities. RWQCB agreed that on-site groundwater issues had been resolved to their satisfaction and <br /> issued a letter to proceed with well decommissioning on December 2, 2011. URS decommissioned the <br /> groundwater monitoring wells on December 9,2012. <br /> FIELD ACTIVITIES <br /> Annual Monitoring Activities <br /> On September 12,2012, URS measured landfill gas concentrations(i.e. methane, oxygen, and carbon <br /> dioxide)using a handheld portable gas monitor, a GEW 2000, within the gas migration monitoring <br /> probes(VW-1 though VW-10), extraction wells(EW-1 and EW-2), and passive vents(VP-1 through <br /> VP-4). URS recorded these measurements in the project logbook <br /> RESULTS <br /> The methane concentrations measured during the quarter were 0% in all gas-migration monitoring <br /> probes,except for a result of 0.6% in VW-6S. Methane concentrations measured in the vapor extraction <br /> wells were 7.1% in EW-1 and 3.4%in EW-2. Methane concentrations measured in the passive vents <br /> were 3.8% in VP-1, 4.3% in VP-2, 5.3% in VP-3, and 4.6% in VP-4. <br /> Oxygen concentrations measured at all sample locations during the quarter ranged from 0.0%to 20.5%. <br /> Carbon dioxide concentrations measured at all sample locations during the quarter ranged from 0.6%to <br /> 29.0%. <br /> Table 1 summarizes results for each probe each extraction well and each passive vent. <br /> H:\Wprocess\25532\WorldEnterpriseNQuarterly RPt\2012\Text doc <br />