My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: O INSTALLATION NOTES: <br /> •CONTRACTOR ASSUMES RESPONSIBILITY TO \ 1. INSTALL DOUBLE WALL FIBERGLASS TANKS WITH CONTINUOUS MONITORING p <br /> ASSURE THAT THE OPERABLE SYSTEM MEETS THE OF HYDROSTATIC ANNULAR SPACES BY"VEEDER-ROOT'TANK AND PIPING <br /> DESIGN INTENT AND THE CONTRACTOR IS \ MONITOR AND ALARM SYSTEM.ALL TANK.SUMPS SHALL BE DOUBLE WALL <br /> PERMITTED TO ADJUST PIPING LOCATIONS BASED AND BE INDIVIDUALLY CONTINUOUSLY MONITORED BY"VEEDER-ROOT" <br /> ON ACTUAL FIELD CONDITIONS AND INSTALLATION \ \ LIQUID SENSORS TIED INTO THE TANK&PIPING MONITOR SYSTEM.TANKS TO <br /> TECHNIQUES. BE SET MIN.60"BELOW FINISH GRADE.TANK INSTALLATION SHALL BE IN <br /> •PRODUCT,VAPOR AND VENT PIPING IS TO SLOPE I ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> TOWARD TANK 1/8"PER FOOT MINIMUM,1/4"PER 2. INSTALL A 8"CONCRETE SLAB OVER TANKS.SURFACE WATER SHALL BE <br /> FOOT PREFERRED. O 16 DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN <br /> •SECONDARY CONTAINMENT PIPING IS SHOWN BY WITH A 1-1/2"DROP IN 18"FROM THE EDGE OF THE MANHOLE RING TO THE <br /> NOTE ONLY,NOT GRAPHICALLY.ALL PIPING TO BE / ° SURROUNDING SLAB ELEVATION.CONSTRUCT SLAB PER CIVIL SLAB <br /> DOUBLE CONTAINMENT PIPE. / INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS. <br /> \ 3. INSTALL MULTIPORT FILL PACKAGE IN A DOUBLE WALL FILL SUMP. <br /> 4. INSTALL VARIABLE SPEED TURBINES IN UNDERGROUND STORAGE TANKS. <br /> VERIFY PROGRAMMING REQUIREMENTS FOR ALTERNATING STARTS WITH <br /> _ PROPERTY LINE I LOCAL AGENCY AS REQUIRED.TURBINE SYSTEMS TO BE EQUIPPED WITH 3 <br /> GPH ELECTRONIC LINE LEAK DETECTION.LEAK DETECTORS ARE TO BE <br /> — TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO STARTUP.CONTRACTOR " <br /> TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN <br /> N 71° '00"E _ 116.61 4 I CLOSE OUT BINDER.SET TURBINE INTAKES AT 5"FROM BOTTOM OF TANKS. <br /> TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS.CONTRACTOR IS <br /> TO LABEL TURBINES AND CONTROLLERS AS TO WHICH PRODUCT THEY <br /> z SERVE.GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE ARCO <br /> \ I OFF OR LOSE POWER. <br /> INSTALL 3"INSIDE 4"FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR BP WEST COAST PRODUCTS,LLC <br /> VAPOR RECOVERY SYSTEM.SLOPE 1/8"PER FOOT MINIMUM TO TANKS. <br /> INSTALL 3"TO 2"REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. <br /> \ J I CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING.TESTING OF <br /> �t9 VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL,PRIOR TO PAVING <br /> i SLOPE ALL VENT PIPING 1/4" \ AND BEFORE STATION OPERATION.SEE DETAILS AND SCOPE OF WORK ON <br /> / PER FOOT PREFERRED,1/8" 8 \ I SHEETS CS-1&CS-2 FOR PIPE SIZING AT UNDERGROUND STORAGE TANKS. <br /> \ PER FOOT MINIMUM 6. INSTALL 2"INSIDE 3"DOUBLE WALL FIBERGLASS PRODUCT SUPPLY LINES TO <br /> 1 / 204 216 217 DISPENSERS.PIPING SHALL BE INSTALLED PER MANUFACTURER'S <br /> 217 218 9 SPECIFICATIONS AND INSTRUCTIONS.PIPING SHALL BE INSTALLED WITH A <br /> I ——____ __ MINIMUM SLOPE OF 1/8"PER FOOT FROM THE FURTHEST DISPENSER SUMP <br /> / 11 203 r O VENT RISER DOWN TO THE TURBINE SUMPS.CONTRACTOR TO INSTALL TRACER TAPE <br /> ASSEMBLY WITH PRODUCT PIPING.TESTING OF PRODUCT LINES SHALL BE PERFORMED <br /> PRIOR TO BACKFILL,PRIOR TO PAVING AND BEFORE STATION OPERATION. <br /> TO TRUCK 1 _ i • I 7. INSTALL"VEEDER-ROOT"TANK AND LINE ALARM CONTROL PANEL IN BUILDING N0. DATE RENSION DESCRIPTION <br /> DISPENSER, AT NORMALLY OCCUPIED LOCATION IN BUILDING.SEE ARCHITECTURAL AND 0 <br /> ——————————————— — ——————————————————————————————————————————— ————————————————— —————————————————— i 1-4 N-,ISSUE <br /> SEE SHEET r--_-----------------==Z=_=====5=____---__--- — _ -- ____ DEF6 I ELECTRICAL DRAWINGS FOR EXACT LOCATION. <br /> 1 _ _ — T — 8. INSTALL A SINGLE 2"INSIDE 3"FRP VENT LINE FOR EACH UNDERGROUND Q F-3 i z znlzoz4 IssuE Foa PERMD <br /> I Q DE STORAGE TANK AND A SINGLE 2"SW FRP VENT LINE FOR THE DEF TANK. <br /> Q ( &4]If034 REVISED PERC.E.H.COMMENTS <br /> F REMO I SLOPE 1/4"PER FOOT(1/8"PER FOOT MINIMUM)TO TANKS AS SHOWN. <br /> 1 I I 1 5 6 18 SLOPE ALL PIPING 118"PER 1 / 4 FILL BOX CONTRACTOR TO INSTALL TRACER TAPE WITH VENT PIPING.SECONDARY Q <br /> FOOT BACK TO TANKS 1 I CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION <br /> II II 214215217 __// ONLY <br /> 1 I i REZ K/ Q I 9. TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12'ABOVE GRADE Q <br /> I I I I 1 15 (TYP) 1 1 \ \ I 1 / V I AND NOT WITHIN S FROM ANY BUILDING OPENING OR PROPERTY LINE THAT <br /> rL7 _ —_ �.f I CAN BE BUILT UPON.VENT RISERS SHALL BE INSTALLED IN ACCORDANCE �] <br /> I I I I D i III I B20 WITH UNIFORM FIRE CODE REQUIREMENTS.VERIFY LOCAL REGULATIONS eQ <br /> 1 1\ DIESEL FOR ADDITIONAL EQUIPMENT OR INSTALLATION REQUIREMENTS. <br /> 11 3+0 / 20 +0 I I I 1 3+0 1 3+1 1 I I 20K 10. INSTALL A SINGLE 1"RIGID GALVANIZED CONDUIT FOR EACH NEWLY <br /> a I I I 11 11 U 1 \ I 1 INSTALLED TURBINE PUMP. to <br /> O I a 1 1 1 11. INSTALL DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING sEu: <br /> E-STOP AND SENSORS.SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER <br /> C? 11 / 1 1 `v 1 204 205 208 213 217 19 OVERFILL A RM AND SUMPS. <br /> c I I I I I 1 1 12. INSTALL EXTRACTOR ASSEMBLIES FOR VENT,AND STAGE II VAPOR <br /> 11 3+0 / 3+0 I I I 1 3+0 20 1 3+1 1 1 \ RECOVERY AT TURBINE SIDE SUMP.VERIFY WITH LOCAL JURISDICTION FOR <br /> 11 ❑ ❑ 11 11 ❑ 11 TYP. 3 12 4 204 206 208 217 218 ALTERNATE REQUIRED LOCATIONS. <br /> 1 1 I I 1 13. INSTALL A GPH MAG PROBE TANK LEVEL GAUGES AT TURBINE SUMPS AS <br /> 1L_ O / 1 _ 11 11 1 1 O I L — SHOWN. <br /> L__L J / L J L J L J TYP. 4 10 13 203 11 14. TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API <br /> / / 0 214 217(TYP.OF 7) o _ _ / 15. INSTALLI WA NE OVATICATION ION SERIESNGS AT ,MULTI-PRODUCT MANHOLES. <br /> DISPENSERS AS SHOWN. <br /> 31'TYPICAL \ 204 205 208 213 217 DISPENSERS TO BE FITTED WITH STAGE II HOSES,NOZZLES AND BREAKAWAY <br /> r I <br /> VALVES.CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES,NOZZLES <br /> \ RE IUM 6f 1 AND BREAKAWAYS.INSTALL DOUBLE WALL UNDER DISPENSER CONTAINMENT <br /> INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING <br /> / AUTO CANOPY,SEE DIESEL SENSORS.START UP BY MANUFACTURER REPRESENTATIVE.GENERAL <br /> 113'(CANOPY) 6K CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH <br /> / MANUFACTURER 204 206 208 217 218 <br /> / PLANS FOR DETAILS EACH HOSE/NOZZLE.ANY AIR POCKETS OR STARTUP PROBLEMS DUE TO ET4'4 ' ol; Fir EUA'L=ETQUE <br /> \ IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS <br /> \ 2 1 14 \ ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR.AFTER PURGING <br /> / THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, <br /> CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED FILTERS WITH NEW <br /> / FILTERS. <br /> / \ \ 16. INSTALL WAYNE OVATION SERIES,HIGH FLOW DISPENSERS AS SHOWN. U <br /> DISPENSERS TO BE FITTED WITH HOSES,NOZZLES AND BREAKAWAY VALVES. � c NTM,b'o° E No.,p � E•^*oUR <br /> \ \ CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES,NOZZLES AND <br /> / \ \ BREAKAWAYS.INSTALL DOUBLE WALL UNDER DISPENSER CONTAINMENT <br /> MINIMUM 20' INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING DEVELOPMENT INFORMATION: <br /> E-STOP RADIUS ( SENSORS.START UP BY MANUFACTURER REPRESENTATIVE.GENERAL <br /> CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH UNDERGROUND STORAGE <br /> EACH HOSE/NOZZLE.ANY AIR POCKETS OR START UP PROBLEMS DUE TO TANK STANDARDS <br /> MAXIMUM 100' IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS <br /> / \ E-STOP RADIUS \ ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR.AFTER PURGING ELEMENT TPOI <br /> / \ THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, V-15.0 2023 SERIES <br /> CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED FILTERS WITH NEW <br /> FILTERS. <br /> I I 17. FILL AND STAGE I VAPOR RECOVERY RISERS&ANNULAR RISER SHALL BE <br /> / GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS. ��'�� <br /> / SEE CS-1&CS-2 FOR CALIFORNIA DESIGN WITH DOUBLE WALL SUMPS. <br /> MAXIMUM 100, o \ LEGEND: 18. ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS 4607 S.AIRPORT WAY <br /> ESTOP RADIUS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. <br /> \ ——— REGULAR GASOLINE PRODUCT PIPING,Z73"D/W FIG` 19. INSTALL OVERFILL ALARM&ACKNOWLEDGMENT SWITCH,ESO IN LOCATION STOCKTON,CA 95206 <br /> PREMIUM PRODUCT PIPING,2"/3"D FIG` SHOWN.ALARM AND SWITCH TO BE LOCATED TO PROVIDE AN <br /> / ESTOP \ NV UNOBSTRUCTED VIEW TO TRUCK DRIVER.PROVIDE BOLLARD PROTECTION <br /> I DIESEL PRODUCT PIPING,2"/3"DNV FIG` OF FREE STANDING POLE.SEE WIRING DIAGRAM AND DETAIL FOR MOUNTING <br /> I B-20 PRODUCT PIPING,3"14"DNV FIG` REQUIREMENTS. DE9craEo". MAK AUJ�NCE <br /> VENT PIPING,Z13"DNV FIG 20. PROVIDE FIRE EXTINGUISHER:KID-10-460 10#4:A-60-BC OR EQUAL. <br /> I VAPOR RECOVERY PIPING,2"/3"DNV FIG alp W RUM: <br /> / VAPOR RECOVERY PIPING,T74"DNV FIG DRAW er TAF AW,WDE PM: <br /> DEF PRODUCT PIPING,2"/3"DNV FIG` <br /> \ \ PRDFM NO,DEF VENT PIPING,2"S/W FIG C <br /> CA-4795 <br /> \ \ \ O# SEE MATERIALS ON SHEET FM-1 AND FM-2 DRAWING T1TLE: <br /> / AUTO DISPENSER <br /> / i <br /> AND TANK <br /> WORK AREA <br /> AM/PM SHEET Na <br /> C-STORE <br /> O20 0 10 20 F_2 <br /> 1 INCH=10 FEET <br />
The URL can be used to link to this page
Your browser does not support the video tag.