Laserfiche WebLink
Cc: 'Kurt Wagenknecht' <kurt@kl2architects.com> <br /> Subject: RE:Airport Plans <br /> Hello <br /> Below is the list of responses that we received from K12 Architects on August 11, 2023, in response to the deficiency list <br /> provided by the EHD on June 13, 2023.The comments from K12 are in red, and the new comments from the EHD are in blue. I <br /> do see that a new set of plans was submitted on October 2, 2023,these comments below are for the previous set of <br /> submittals. In the interest of expediency, before I start reviewing the October 2n1 submittal in detail, please let me know if any <br /> revisions from the comments below,will impact the sheets that you already submitted on Oct 2nd and I will wait to review it all <br /> at once when I receive updated sheets. Please be sure to"cloud" all the plan changed either related to my comments or <br /> completely unrelated, identifying changes,this helps with review and speeds up the response. <br /> Also, here are the comments that were emailed on 9/28/2023: <br /> 1. Provide all certifications for the installer and tester, previously submitted certifications are for the old contractor <br /> 2. #1 from the previous deficiency list is still outstanding <br /> 4. Need*aRk e-hakS a.Rd overfill calculations <br /> 5. T&L1 lists zone 5 as DEF,which is supposed to be single-walled, correct zones. <br /> 6. The parts list cross reference lists wrong parts throughout the plans, I will provide some examples once I provide all <br /> the comments on Tuesday. <br /> Response to comments from August 2023 submittals are in blue: <br /> 1. Provide updated service requests and permit applications to remove MVP, this should also <br /> include correct billing information and a fire permit number(provide a front page of the approved <br /> permit). All appropriate checkboxes and monitoring details should be indicated. We have not chosen a contractor <br /> yet. When we have we will update all these forms. EHD: Still need, be sure to include a valid fire permit for thanks <br /> installation. <br /> 2. Provide ELD workplan This is done by the contractor. EHD: Still need, <br /> 3. Provide tank charts and overfill calculations See attached sheets. EHD: We didn't receive this information with <br /> the August 11 submittal from K12, however, it appears that we received tank charts with the October 2, 2023 <br /> submittal. No overfill calculations were provided and are still needed. Though the exact dimensions may not be <br /> known, a sample calculation for the proposed overfill method is still needed. <br /> 4. Sheet T&L1 lists 24k/6k tank and Sheet CO lists 20K/6k tank. The cover sheet is new, revised the scope of work. <br /> EHD: Sheet CO submitted on 8/11/2023 by K12 lists "THERE IS A 32K TANK, SPLIT 6K FOR DIESEL#2, 24K FOR B20 <br /> DIESEL, 6K FOR DEF." Based on 6+24+6, the tank should be 36K, please clarify tank capacities. Sheet T&L1, note 18 <br /> lists a 32000-gallon double wall tank 6K DEF/20K diesel/6K diesel, for a total of 32K. This original EHD's comment <br /> was not addressed with 8/11/2023 submittal, however, It appears that some revised sheets were submitted on <br /> 10/2/2023 and will be reviewed. <br /> 5. Identify smart sensor locations on T&L1 sheet See sheet T&L1. EHD: sensors were identified, however, there are <br /> some discrepancies between the listed sensors and the parts list. Revised sheets were received on 10/2/2023 and <br /> will be reviewed. See below for examples of these discrepancies. <br /> 6. Page T&L2 indicates that if people are entering the excavation OSHA notification and a <br /> permit is required. Please submit this permit copy for the tank set and anchoring work- if not <br /> available yet, this must be submitted before scheduling tank set inspection. Same page detail C6- <br /> "1/4"fuel hose capped"—clarify if this is a fuel hose or a vacuum hose. Also on C6 detail "opening <br /> through primary wall"—no openings through the primary wall are allowed. Contractor will do this. EHD: Still need. <br /> 7. Identify the means to check communication for vacuum monitoring on piping secondary <br /> containment on page T&L2, UDC detail. See details EHD: corrected. <br /> 2 <br />