My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. Detail F) and DI show the hydrostatic sensor as#804 but#804 is shown on T&L7 as barbed fitting <br /> g. Detail D1 shows item #402 near piping in the UDC but this#402 is shown on T&L& as a dispenser hose <br /> 10. Sheet T&L4 <br /> 1. What is going through the chase pipe being monitored? <br /> 2. Detail A3 shows that the vapor line vacuum line is in the 87 fill but T&L1 shows all vacuum kits (#802 and <br /> #803) in the STP sumps.T&L1 also shows vapor lines only in the 87 STP and 91 STP <br /> 3. The 87 fill sump detail shows vacuum lines for vent and vapor coming out of the chase piping.T&L1 does <br /> not show that there are any vent or vapor piping coming out of the 87 fill sump.The 87 fill sump in T&L1 <br /> looks like only chase piping is coming out of it <br /> 4. What are these lines coming out of the fill sump?What is the line connecting the vapor and fill pipes? <br /> UOP Ile <br /> Aw <br /> 11. Sheet T&L5 <br /> a. This sheet refers to a different materials list sheet number that is not included in the plans <br /> b. What do the numbers in triangles refer to?The other sheets have numbers in diamonds which refer to <br /> the materials sheet on T&L7 but on this sheet numbers in diamonds refer to the notes on this sheet. <br /> 12. Sheet T&L6 <br /> a. #609 is listed in detail C-C but is not listed on the materials sheet T&L7 <br /> b. A test port is not shown on the dispensers with diesel product line (detail C-C) <br /> c. Detail D-D has#402 pointing to primary piping but#402 on T&L7 looks to be a dispenser hose <br /> 13. Sheet T&L7,T&L7.1 and Equipment List from Shields, Harper&Co (4/14/2022): <br /> a. For the auto side there are a total of 6 UDCs listed but the Equipment List shows 8 UDCs.The plan <br /> diagrams show 8 dispensers at the auto side. <br /> b. The Equipment List and cut sheet provided (B501-S-222) shows single walled transition vent sumps will <br /> be installed but sheet T&L1 shows that there will be an interstitial sump sensor located in the vent sump <br /> indicating a double-walled sump. Ensure plan is accurate throughout with what will be installed. <br /> i. Sheet T&L7.1 shows B600-F3S-B-D-AB describing a double walled <br /> vent box. <br /> ii. Sheet T&L2 has Bravo BR-B500-FS3-B-D-AB shown (single walled <br /> vent box) <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.