Laserfiche WebLink
3 <br /> <br />3. Page FT-4, identify all the piping and penetrations in detail A, B, C, D. Ensure <br />the plans are correct. <br />On FT-4, details A, B, C, D, are updated to show correct orientation of product piping. All the piping and penetrations <br />are labeled. <br />On FT-1 and FT-2, detail B, the regular, premium and diesel tank STP sumps were updated to reflect the FT-4 <br />updates. <br />On FT-4, detail F, the unidentified conduit and penetrations have been labeled. <br /> <br /> <br />4. Page FT-5: Clarify detail B & D. The number of pipes/penetrations in the <br />regular and B20 biodiesel fill sump does not reflect detail A & C <br />The vent and vapor recovery piping is not shown in the elevation view and the conduits are not shown in the plan <br />view for clarity. On FT-5 and FT-5.1, a note has been added to each detail stating which pipe/conduit and <br />penetration is not shown for clarity. <br />