My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR2500817
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2026 12:59:00 PM
Creation date
7/18/2024 2:58:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500817
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004996
FACILITY_NAME
AIRPORT PETROLEUM, LLC
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
Stockton
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4607 S AIRPORT WAY Stockton 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
irr Puw ouffNKM AME TIEDT13 <br /> WU_DVt_MC.:0'nl�"M �'E' <br /> ..SMMT F13M <br /> -L"�LCCAYKm <br /> HCWL RUN 10 amcim akw.umKm'j--' <br /> —11.M <br /> 37'WAKMW <br /> MP: <br /> WMUUW8zj4!WM P 7...% <br /> FZSEJMLYIUTM <br /> MCUWRffZft4AIEKP.T <br /> INS93C 3-MT.MIF <br /> LG MMtT <br /> 0' rn rima W Text FC*Y <br /> rmr� &MUM <br /> tmv F"�f�.j <br /> r:)%Lw SENSDPI� <br /> IM. OLL BUW <br /> —49r MAKE WALL Mffid <br /> HUW LV-UID uowh3hm OOWTCOM OL90 <br /> 5nscm Mculn <br /> W INWDE�r DW&DAMb 9XII <br /> Pop emrmy rilfma�. <br /> 7 IMME T FW PM'. X� <br /> TDOWEMMM'. X'. <br /> F'' B20 DIESEL STP SUMP- PLAN <br /> 3. Page FT-4, identify all the piping and penetrations in detail A, B, C, D. Ensure <br /> the plans are correct. <br /> On FTA details A, B, C, D, are updated to show correct orientation of product piping.All the piping and penetrations <br /> are labeled. <br /> On FT-I and FT-2, detail B,the regular, premium and diesel tank STP sumps were updated to reflect the FT-4 <br /> updates. <br /> On FT-4, detail F,the unidentified conduit and penetrations have been labeled. <br /> 4. Page FT-5: Clarify detail B & D. The number of pipes/penetrations in the <br /> regular and B20 biodiesel fill sump does not reflect detail A & C <br /> The vent and vapor recovery piping is not shown in the elevation view and the conduits are not shown in the plan <br /> view for clarity. On FT-5 and FT-5.1, a note has been added to each detail stating which pipe/conduit and <br /> penetration is not shown for clarity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.