Laserfiche WebLink
8 <br />Thanks for taking a few minutes to discuss the comments with me this aŌernoon. <br /> <br />The responses to the review comments are below in RED. <br /> <br />No revisions to the plans have been made per this set of review comments. I have a Ʃached the set of plans dated 2024- <br />04-05 for your convenience. <br /> <br />Please let me know if you have any ques Ɵons. Thanks, <br /> <br />Alex Korek <br />Diamond Z Engineering, Inc. <br />5670 State Road - Cleveland, OH 44134 <br />(440) 842-6501 (Office) <br />(440) 596-8523 (Cell) <br /> <br />From: Saetern, Kristina Gaen [EHD] <ksaetern@sjgov.org> <br />Sent: Thursday, April 18, 2024 11:23 AM <br />To: s.mann@norcaloffice.com; Alex Korek <Alex.Korek@diamondzengineering.com> <br />Cc: Gurkamal Dhaliwal <g.dhaliwal@norcaloffice.com>; 'CJ Dhaliwal' <cj.dhaliwal@norcaloffice.com> <br />Subject: SR0083837 - 4607 Airport Way <br /> <br />Hello, <br /> <br />The San Joaquin County Environmental Health Department (EHD) has completed a preliminary review of the <br />underground storage tank installation application for 4607 Airport Way, Stockton (SR0083837). Please provide the <br />following additional information and address the following comments: <br /> <br />1. Clarify the following: Franklin Fueling flex connectors model numbers on the part list (FM-2) does not match the <br />cut sheet provided. Provide cut-sheets with the model numbers. <br />Per our conversation 4/24/2024, this comment has been resolved since Franklin Fueling does not offer a cut- <br />sheet for every flex connector option. <br />2. Provide the OPW drop tube cut sheet for 71SO-410C. This was changed from 71SO-410CB. <br />See attached. <br />3. What is the ground water/water table level? <br />The ground water is approximately 50’ below grade. <br />4. Identify and provide septic and well locations on the site plan. <br />The site has public water and sewer and does NOT contain a septic or a well. <br />5. Clarify the single wall fiberglass information on page CS-1 Section 9 Vent Piping Installation. Per the installation <br />guide, it mentions single wall installation for vent piping. Be specific. <br />The site has both double wall vent piping and single wall vent piping. The only single wall vent piping is for DEF. <br />The gasoline, diesel, and B20 will have double wall vent piping. <br />CS-1 Section 9 Vent Piping Installation, paragraph 5 specifies the Double Wall vent piping. California Variant: <br />Vent piping to be double walled and installed with continuous vacuum monitoring device per AB-2481 <br />requirements. <br />