Laserfiche WebLink
7 <br /> <br />SEAN MURPHY <br />CEO/OWNER <br />TOWN & COUNTRY CONTRACTORS INC. <br />3206 LUYUNG DR <br />RANCHO CORDOVA, CA 95742 <br />(O) 916-636-9500 <br />(C) 916-997-4527 <br />(F) 916-636-9507 <br />SEAN@TCCONTRACTORS.COM <br /> <br />From: Rivera, Stacy [EHD] <srivera@sjgov.org> <br />Sent: Wednesday, July 16, 2025 5:00:47 PM <br />To: Gurkamal Dhaliwal <g.dhaliwal@norcaloffice.com> <br />Cc: CJ Dhaliwal <cj.dhaliwal@norcaloffice.com>; Saetern, Kristina Gaen [EHD] <ksaetern@sjgov.org>; SeanMurphy <br /><Sean@tccontractors.com>; s.mann@norcaloffice.com <s.mann@norcaloffice.com>; <br />alex.korek@diamondzengineering.com <alex.korek@diamondzengineering.com>; alex.kandathil@mattr.com <br /><alex.kandathil@mattr.com>; dennis.hockenberry@mattr.com <dennis.hockenberry@mattr.com>; <br />robert.dubois@mattr.com <robert.dubois@mattr.com>; michelle.reed@mattr.com <michelle.reed@mattr.com>; <br />cary.etter@mattr.com <cary.etter@mattr.com>; david.beard@mattr.com <david.beard@mattr.com>; <br />patrick@bostonmcdermott.com <patrick@bostonmcdermott.com>; stefanfiberglassunlimitedinc@gmail.com <br /><stefanfiberglassunlimitedinc@gmail.com> <br />Subject: SR0083837 - 4607 S. Airport Way, Stockton - Install Repairs <br /> <br />Good afternoon, <br /> <br />Following the repairs that were made to the newly installed, not yet approved underground storage tanks, our <br />department will be requiring the following inspections in addition to those already listed on the UST <br />installation approval letter: <br /> <br />1. Primary tank test of all three tanks in the split tank, in accordance with manufacturer specifications. <br />2. Secondary containment tank test of the split tank (interstice testing), in accordance with <br />manufacturer specifications, prior to brine filling. <br />3. Confirmation of interstice continuity for all three compartments in the split tank. <br />4. Secondary piping test: Pressure testing of all piping (product, vapor recovery, vent, and chase), in <br />accordance with manufacturer specifications. <br />5. Integrity testing of all tank top sumps, in accordance with manufacturer specifications. <br />6. Verification of brine type, and witnessing of brine addition in the split tank and tank top sumps. <br />