Laserfiche WebLink
SEAN MURPHY <br /> CEO/OWNER <br /> TOWN & COUNTRY CONTRACTORS INC. <br /> 3206 LUYUNG DR <br /> RANCHO CORDOVA, CA 95742 <br /> (0) 916-636-9500 <br /> (C) 916-997-4527 <br /> (F) 916-636-9507 <br /> SEAN @TCCONTRACTORS.COM <br /> From: Rivera, Stacy [EHD] <srivera@sogov.org> <br /> Sent: Wednesday,July 16, 2025 5:00:47 PM <br /> To: Gurkarnal Dhaliwal <g.dhaliwal@norcaloffice.com> <br /> Cc: CJ Dhaliwal <ci.c1ha1iwa1@norca1office.corn>; Saetern, Kristina Gaen [EHD] <ksaetern@swgov.org>; SeanMurphy <br /> <Sean @tccontractors.corn>; s.mann@norcaloffice.com <s.rnann@norcaIoffice.corn>; <br /> alex.korek@diamondzengineering.com <alex.korek@diamondzengineering.com>; alex.kandathil@mattr.com <br /> <alex.kandathil@mattr.com>; den nis.hockenberry@ mattr.corn <den nis.hockenberry@ mattr.corn>; <br /> robert.dubois@mattr.com <robert.dubois@rnattr.corn>; rn ichelle.reed@ mattr.corn <rn ichelle.reed@ mattr.corn>; <br /> cary.etter@mattr.com <carV.etter@mattr.com>; david.beard@mattr.com <david.bearc1@rnattr.com>; <br /> Patrick@bostonmcdermott.com <patrick@bostonrncderrnott.corn>; stefanfiberglassunlimitedinc@gmail.com <br /> <stefanfiberglassunlimitedinc@gmail.com> <br /> Subject: SR0083837-4607 S.Airport Way,Stockton - Install Repairs <br /> Good afternoon, <br /> FoLLowing the repairs that were made to the newly instaLLed, not yet approved underground storage tanks, our <br /> department wiLL be requiring the foLlowing inspections in addition to those aLready Listed on the UST <br /> instaLLation approval.Letter: <br /> 1. Primary tank test of aLL three tanks in the spLit tank, in accordance with manufacturer specifications. <br /> 2. Secondary containment tank test of the spLit tank(interstice testing), in accordance with <br /> manufacturer specifications, prior to brine fiLLing. <br /> 3. Confirmation of interstice continuity for aL1 three compartments in the spLit tank. <br /> 4. Secondary piping test: Pressure testing of aLL piping(product,vapor recovery,vent, and chase), in <br /> accordance with manufacturer specifications. <br /> 5. Integrity testing of aL[tank top sumps, in accordance with manufacturer specifications. <br /> 6. Verification of brine type, and witnessing of brine addition in the spLit tank and tank top sumps. <br /> 7 <br />